Similar Projects
Heat Treat Services
Bidding
CO

HVAC - CRAC Re-Acq
Post-Bid
Colorado Springs, CO 80916

HVAC-CRAC ReAcq Synopsis
Post-Bid
$50,000 to $9,990,000 est. value
Colorado Springs, CO 80914

Repair HVAC Harmon Hall Arnold Hall
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO 80840

Cooling Tower Repairs and Renovations
Results
Less than $50,000 est. value
Colorado Springs, CO 80906

Replace Rooftop Air Condenser Unit
Post-Bid
Colorado Springs, CO

CM Engineering and Applied Science Building Chiller Plant Upgrades
Results
Colorado Springs, CO 80918

Building 1840 Computer Room Air Conditioner (CRAC) Replacement
Post-Bid
Colorado Springs, CO 80916

Centennial Hall HVAC Upgrade
Results
Colorado Springs, CO

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Blast Booth, Media Reclaim System, and Dust Collection System Cleaning
Results
Colorado Springs, CO 80914

Pioneers Museum Offsite Storage HVAC Upgrade
Post-Bid
Colorado Springs, CO 80903

Repair Chemical Feeders for Heating and Chilled Water Systems
Results
Colorado Springs, CO 80914

Improvements to the HVAC System Windows and Indoor Air Quality Berg Building
Post-Bid
Less than $1,417,414 est. value
Colorado Springs, CO 80900

Cooling Tower Blanket Contractor Repair Services
Term Contract
Results
Colorado Springs, CO 80903

Last Updated 10/14/2020 11:08 AM
Project Title

Sustain Repair Air Handler Units - West Fairchild Hall

Physical Address View project details and contacts
City, State (County) Black Forest, CO 80840   (El Paso County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project: XQPZ 16-0148 - Sustain Repair Air Handler Units - West Fairchild Hall: Purpose of the project is to upgrade air handling units (AHU's) in 3 ground floor mechanical rooms. Most of the AHU systems in Bldg 2354, Fairchild Hall are original to the building and in operation since approximately 1960: - Perform HVAC upgrades to 14 air handling units in 3 ground floor mechanical rooms. - Demolish existing ducted units, and replace with new units. - Work includes the following: HVAC demo, HVAC ductwork, HVAC piping, Electrical wiring, ACM abatement, HVAC balancing. - Estimated duration of work is 400 days, with temporary heating or cooling for offline air handling units. - Exhaust fan replacement.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents