Similar Projects
Downtown Inner Loop Improvements Phase 1
Infrastructure
Bidding
$7,500,000 est. value
Celina, TX

Street Maintenance for District 10
Infrastructure
Bidding
$97,000 est. value
Celina, TX

Flexible Pavement Mill and Overlay
Post-Bid
Less than $481,273 est. value
TX

Preston Ridge - Fire Lane Addition
Post-Bid
Frisco, TX 75035

Southern Region Disaster Recovery Support BPA
Results

Fishtrap Road and Teel Parkway Intersection Improvements and Traffic Signal
Results
$286,225 est. value
Prosper, TX 75078

Wilmeth Road (Lake Forest Drive to Hardin Boulevard)
Infrastructure
Bidding
$18,600,000 est. value
McKinney, TX 75071

Paving Improvements for Inspiration, Phase 8A
Post-Bid
TX

Main Replacements & Street Rehab (Northwood Park/Westwood Park Area)
Results
Frisco, TX 75069

Paving Facilities for the East Fork Wastewater Treatment Plant
Infrastructure
Bidding
Weston, TX

Phase 4A/4C - Bridgewater Paving Package
Post-Bid
TX

Civil Improvements for the Light Farms Prairie Crossing Re-Alignment
Results
$1,830,367 est. value
Celina, TX 75009

Civil Improvements for the Light Farms Ways - Outerloop Connection
Infrastructure
Bidding
Celina, TX

Paving Improvements to Serve Elevon, Phase 1A and 1B
Post-Bid
Lavon, TX

Frisco Rockhill Phase 2 - Paving Improvements
Results
Frisco, TX 75034

Last Updated 11/13/2021 02:06 AM
Project Title

Coit Road Widening (Main Street to Buckeye Drive)

Physical Address View project details and contacts
City, State (County) Frisco, TX 75034   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,610,000 to $7,260,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Widen approximately 11,000 LF of Coit Road from four to six lanes from Main Street to Buckeye Drive. Work includes: paving, adjustment of traffic signals at the intersections with Main Street and Eldorado Parkway, a pedestrian hybrid beacon signal at Hay River Trail, minor drainage, pavement markings, traffic control, erosion control, illumination, median irrigation, and landscaping from Main Street to Buckeye Drive.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents