Similar Projects
Powerline Trail Phase 2 - City of Greenfield
Infrastructure
Conception
$1,270,000 est. value
Greenfield, WI

Redevelopment Opportunity - 1214 Milwaukee Avenue - City of South Milwaukee
New Construction, Infrastructure
Conception
$3,474,055 CJ est. value
South Milwaukee, WI 53172

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

Mechanical Demolition
Demolition
Post-Bid
Milwaukee, WI 53206

Mechanical Demolition
Demolition
Post-Bid
Milwaukee, WI 53206

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Crack Filling
Infrastructure
Results
Wauwatosa, WI

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Oakview Parkway Industrial Building
New Construction, Infrastructure - 130,710 SF
Construction
$90,000,000 CJ est. value
Oak Creek, WI 53154

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

North Avenue Paving - Mayfair Road to 117th Street - 1112 - City of Wauwatosa
Alteration
Conception
$3,000,000 est. value
Milwaukee, WI 53226

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

2022 Green Infrastructure Upgrades BP 1
Renovation, Infrastructure
Post-Bid
$317,000 to $553,000 est. value
Milwaukee, WI 53206

Last Updated 03/28/2023 11:18 AM
Project Title

Wisconsin 175 Improvements - Wisconsin Department of Transportation

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53224   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Feasibility Study, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $6,686,850 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This segment of WIS 175, known as the Stadium Freeway, was originally constructed 60 years ago. The aging road requires reconstruction to improve neighborhood cohesion and ensure acceptable traffic operations. As of March 28, 2023, this project is in the early planning/study phase. The study is planned to be complete by the end of 2024. An engineer has not been selected. A firm timeline for construction has not been determined.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents