Similar Projects
New Pump Station
New Construction
Conception
$974,500 est. value
Waterloo, WI

Sewer Reconstruction - City of Madison
Build-out, Infrastructure
Conception
$2,551,000 CJ est. value
Madison, WI 53715

Lift Station 1 & 2 Rehabilitation Camp Williams Department of Military Affairs - GPC
Renovation
Bidding
$378,610 CJ est. value
Madison, WI 53715

Johnson Park Lift Station Improvements
Infrastructure
Bidding
Racine, WI 53403

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

Well House #2 Improvements Rebid
Infrastructure, Renovation
Post-Bid
$1,608,966 CJ est. value
Kendall, WI 54638

Jefferson Street Storm Lift Station
New Construction
Results
$50,000 est. value
Portage, WI 53901

Lift Station Rehabilitation
Renovation
Results
Rosholt, WI

Trenchless Sewer Rehabilitation - 10450 - City of Madison
Build-out, Infrastructure
Conception
$190,949,000 CJ est. value
Madison, WI 53715

229 Felland Road Booster Pump Install
Infrastructure
Bidding
$500,000 CJ est. value
Madison, WI 53718

Landfill Lift Station Modifications
Renovation
Post-Bid
Appleton, WI 54911

South 14th Street Lift Station and Force Main
Renovation, Infrastructure
Results
Manitowoc, WI

Unit Well 12 Conversion to a Two Zone Well - 10452 - City of Madison
Demolition, New Construction, Infrastructure
Conception
$4,058,000 CJ est. value
Madison, WI 53707

Final Effluent Pump No. 5 Rebuild at South Shore Water Reclamation Facility
Renovation
Bidding
$2,000,000 CJ est. value
Oak Creek, WI 53154

Solid Waste Station And Recycling Transfer Station Hauling
Renovation
Post-Bid
WI

Last Updated 06/23/2023 11:33 AM
Project Title

Replace North Campground Lift Station

Physical Address View project details and contacts
City, State (County) Saint Croix Falls, WI 54024   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 23, 2023, bids will rebid. No definite date for the rebid.**  SCOPE 8 This section provides information common to two or more technical site work specification sections or 9 items that are of a general nature, and not included in other sections. This section applies to ALL site work, 10 as applicable. Included are the following topics: 11 PART 1 - GENERAL 12 Scope 13 Related Work 14 Referenced Organizations 15 Referenced Documents 16 Quality Assurance 17 Safety 18 Permits 19 Construction Limits 20 Equipment & Materials Furnished by Others 21 Provisions for Future Work 22 Work by Others 23 Submittals 24 Off Site Storage 25 Codes 26 Certificates and Inspections 27 PART 2 - MATERIALS 28 Barricades, Signs, and Warning Devices 29 Temporary Plastic Barrier Fencing 30 PART 3 - EXECUTION 31 Maintenance of Site and Building Access/Egress 32 Continuity of Existing Traffic/Parking and Traffic Control 33 Protection and Continuity of Existing Utilities 34 Protection of Existing Work and Facilities 35 Stormwater/Excavation Water Management SCOPE 9 This section provides information resulting from subsurface investigations completed at the site as part of 10 this project. This section may contain information applicable to ALL sitework, and other technical 11 specification sections, as well. All Contractors are expected to review this information as part of their 12 duties to familiarize themselves with the site. 13 14 Results of the geotechnical investigation apply only to the locations at which data was collected, at the 15 specific time it was collected. Geotechnical conditions may differ elsewhere on the site. 16 17 Prior to making additional investigations of his own using test pits, borings, or other methods; Bidder shall 18 first gain permission from property owner and DFD Project Manager. Geotechnical investigations 19 completed by Bidder shall comply with all applicable requirements of Division 01 through Division 33 of 20 this project

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents