Similar Projects
US Highway 75 Expansion - Iowa Department of Transportation
Infrastructure
Design
$29,000,000 CJ est. value
Sioux Center, IA 51250

US Highway 75 Expansion - Iowa Department of Transportation
Infrastructure
Design
$29,000,000 CJ est. value
Sioux Center, IA 51250

PCC Patching - US 75
Infrastructure
Bidding
$1,000,000 CJ est. value
Sioux Center, IA 51250

PCC Patching - US 75
Infrastructure
Bidding
$1,000,000 CJ est. value
Sioux Center, IA 51250

Kwik Trip / Sioux Center
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Sioux Center, IA 51250

Kitchen Renovation Sioux Center Christian School
Addition, Demolition, Renovation, Infrastructure - 4,869 SF
Post-Bid
$600,000 CJ est. value
Sioux Center, IA 51250

High School Addition & Renovation
Addition, Demolition, Renovation, Infrastructure - 192,000 SF
Results
$3,944,183 CJ est. value
Orange City, IA 51041

Sioux Center - 2nd Avenue South East Water Main Replacement
Infrastructure
Results
$206,615 CJ est. value
Sioux Center, IA 51250

2022 City of Sioux Center Commercial Development Project
Infrastructure
Construction
$783,190 CJ est. value
Sioux Center, IA 51250

2022 City of Sioux Center Commercial Development Project
Infrastructure
Construction
$783,190 CJ est. value
Sioux Center, IA 51250

2022 Bond - Rock Valley School District
New Construction, Build-out, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Rock Valley, IA 51247

2023 City of Orange City MOC-FV Elementary School Demolition Project
Demolition, Infrastructure
Bidding
$300,000 CJ est. value
Orange City, IA 51041

RFP Construction Manager - Dordt University - Dining Commons / Recital Hall Addition
Addition, Demolition, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Sioux Center, IA 51250

420th St- PCC Overlay
Infrastructure
Results
$2,500,000 to $3,000,000 est. value
IA

RFQ - Construction Manager Rock Valley CSD New High School Addition
Addition, New Construction, Infrastructure
Bidding
$12,000,000 CJ est. value
Rock Valley, IA 51247

Last Updated 10/17/2023 10:24 AM
Project Title

PCC Patching - Various Location

Physical Address View project details and contacts
City, State (County) Sioux Center, IA 51250   (Sioux County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Proposal Id: 231017 R1 County: Sioux NHSX-018-1(099)--3H-84 ROUTE: U.S. 18 ECL Rock Valley to Hull NHSX-060-2(089)--3H-84 ROUTE: IOWA 60 0.8 mi S of Co Rd B46 to 0.4 mi N of Co Rd B46 (NB) STP-010-2(045)--2C-71 ROUTE: IOWA 10 In Paulina, from the WCL to the ECL STP-143-1(006)--2C-18 ROUTE: IOWA 143 E Section St to E Railroad St in Marcus Working Days : 70 Estimated Value : $1,500,000 - $2,000,000 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 205 - PCC Patching - Various Location *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Payment for Dowel Bar Retrofit will be paid at the contract unit price per each bar. Payment shall be considered full compensation for furnishing all labor, equipment, and materials necessary to perform the work prescribed in this specification.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents