Similar Projects
Davis Islands Bridge 105606 Repair
Post-Bid
Less than $365,800 est. value
Tampa, FL 33602

PSL Bridge Deck Replacement
Post-Bid
Port Saint Lucie, FL 349845099

Philippe Park Pedestrian Bridge
Results
$463,335 est. value
Safety Harbor, FL

I-275 HFB TBNext Section 3
Results

Sun Island Exit Bridge Over Boca Ciega Bay - Bridge #157601
Renovation
Construction
South Pasadena, FL

Bridge Related Repairs
Post-Bid
Saint Petersburg, FL 33731

Urban Core Riverfront Revitalization and Complete Streets - Hart Bridge Expressway and Talleyrand Connector
Results
Less than $30,962,163 est. value
Jacksonville, FL

Phase 2 Mastadon Bridge Project (Construction)
Post-Bid
Inglis, FL

Cedar Hammock CDD Lake Bulkhead and Bridge Replacement and Repair
Results
$3,143,368 est. value
Naples, FL

Bridge-Preventative Maintenance and Emergency Repair Services
Term Contract
Post-Bid
Dunedin, Indian Shores, Tarpon Springs, FL

SR 15A (Pine Avenue) Pedestrian Bridge/Sidewalk Improvement Project
Results
Green Cove Springs, FL 32043

Bridge Maintenance and Repairs
Term Contract
Results
Fort Myers, FL

Peace Way Over Drainage Ditch Bridge Repairs
Results
FL

R and R Intermediate Bridges
Results
Less than $390,488 est. value
FL

Repair and Reposition Elastomeric Bearing Pads - Dave Rawls Flyover Bridge
Results
Less than $126,950 est. value
Jacksonville, FL 32226

Last Updated 11/25/2019 08:04 AM
Project Title

Capri Isles Boulevard Bridge Replacement

Physical Address View project details and contacts
City, State (County) Venice, FL 34292   (Sarasota County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the replacement of the structurally deficient bridge on Capri Isles Blvd. over Curry Creek and includes milling & resurfacing of approaches, additional bike lanes, upgrades to pedestrian facilities, and utility improvements. The bridge is approx. 84 feet long and 44 feet wide.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents