Similar Projects
M1lb--Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

Runway 7R-25L Pavement Rehabilitation Material Testing
Renovation
Post-Bid
Milwaukee, WI 53207

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Lake Parkway - Milwaukee / St. Francis, E. Lincoln Avenue to S. Pennsylvania Avenue
Results
Milwaukee, Saint Francis, WI 53207

East-West BRT Intersection
Post-Bid
Milwaukee, WI

Brown Deer Road, C Milwaukee and V Brown Deer, 91St Street to Deerbrook Trail
Results
Brown Deer, Milwaukee, WI

Milwaukee Mitchell International Airport T & M Metal Fabrication & Asphalt Paving
Term Contract
Post-Bid
Milwaukee, WI

2021 Concrete Pavement Patch
Results
Less than $700,000 est. value
Cudahy, WI

2021 Time And Material Zoological Gardens
Term Contract
Post-Bid
Milwaukee, WI

Carrington Avenue and Kirkwood Avenue Water Main Replacement and Asphalt Pavement Rehabilitation
Results
$300,000 est. value
South Milwaukee, WI

Asphalt High Impact Paving- Group 3
Post-Bid
Milwaukee, WI

2021 Resurfacing
Renovation
Results
Glendale, Milwaukee, WI

Remodeling and Repairs 2820 N 22Nd Street
Renovation
Post-Bid
Milwaukee, WI

2021 Green Infrastructure Upgrades Bid Package 2
Results
Milwaukee, WI 53204

Asphalt High Impact Paving- Group 4
Post-Bid
Milwaukee, WI

Reported 06/21/2022 04:09 PM
Project Title

South Kinnickinnic Avenue Resurfacing - City of Saint Francis

Physical Address View project details and contacts
City, State (County) Saint Francis, WI   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $328,925
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Saint Francis, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway. As of June 16, 2022, an engineer has been selected and this project is in the design phase. It is anticipated bids will commence in November 2022. A firm timeline for construction has not been determined. Proposed plans to resurface S. Kinnickinnic Avenue from E. Howard Avenue to E. Lunham Avenue. The proposed improvements are to mill off the existing asphalt and replace it with new asphalt. There will also be spot replacement of curb and gutter, driveway approaches, and sidewalk. All handicap ramps at the intersections that are not up to current code will be replaced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents