Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

Chambers Road Over Sand Creek Bridge Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Aurora, CO 80011

Chambers Road Over Sand Creek Bridge Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Aurora, CO 80011

Riser Rings
Term Contract
Post-Bid
CO

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

On-Site Improvements
Results
Greenwood Village, CO 80111

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Centennial Medical Plaza
New Construction, Renovation, Infrastructure - 61,000 SF
Pending Verification
$7,000,000 CJ est. value
Centennial, CO 80112

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Centennial Medical Plaza Center
New Construction, Renovation, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Centennial, CO 80112

2021 Roadway Improvements Project
Infrastructure
Post-Bid
Bow Mar, CO

Last Updated 09/09/2022 10:05 AM
Project Title

Downtown Raised Crosswalks

Physical Address View project details and contacts
City, State (County) Littleton, CO 80120   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $971,179 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Littleton Public Works is constructing raised crosswalks to improve pedestrian safety in the downtown area. This project consists of construction of raised crosswalks at three sites: 1) Prince Street at Little's Creek (south of Alamo Avenue); 2) Alamo Avenue east of Prince Street; and 3) Main Street east of Sycamore Street. The project includes curb and gutter, sidewalk, curb ramps, base course, concrete pavement, inlets, storm sewer, lighting, fire hydrants, signing and striping. General Requirements - Bid Deposit Required - Prevailing Wage Required - Certified Payroll Question Acceptance Deadline 06/30/2022 03:00 PM EDT Questions are submitted online No Piggyback Contract No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents