Similar Projects
I-75 MLK DDI
Bidding
FL

Bike Lane/Sidewalk/Milling and Resurfacing/Drainage Improvements
Bidding
$3,745,754 est. value
FL

Parking Lot at Park Place
Infrastructure
Sub-Bidding
Oakland Park, FL 33334

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

Lowe's #2472 - Parking Lot Rehabilitation
Renovation
Post-Bid
Jacksonville, FL 32218

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Mirada Crystal Lagoon
New Construction - 27,352 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Wesley Chapel, FL

The Sanctuary at James H Shimberg Estates Parking Lot Resurfacing
Infrastructure
Bidding
Tampa, FL 33604

Front Street Complete Streets Project
Post-Bid
Melbourne, FL 32901

4th Avenue Sidewalk - JSEB Set-Aside
Results
Jacksonville, FL 32202

Southwood Community Center Parking Lot Renovation
Infrastructure
Bidding
$727,000 est. value
Orlando, FL 32809

VCA Improvements to Common Areas & Parking Spaces
Post-Bid
Hialeah, FL 33014

Northwest Macedo Boulevard Sidewalk Construction Project - Lap Funded
Results
Less than $800,000 est. value
Port Saint Lucie, FL 34983

Amelia River Waterfront Stabilization Parking Lots C and D
Infrastructure
Bidding
Fernandina Beach, FL

Last Updated 05/17/2021 03:31 AM
Project Title

Harrison Avenue Reconstruction Segment 1

Physical Address View project details and contacts
City, State (County) Panama City, FL 32461   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project primarily involves reconstruction of Harrison Avenue from Government Street to 4th Street, and reconstruction on the side streets: Government Street, Beach Drive, Oak Avenue, and 4th Street. The major items of work involve: mobilization, clearing and grubbing, erosion control, maintenance of traffic, earthwork, stabilization, base, asphalt for bicycle lanes, curb, gutter, stormwater system replacement, soil cells, landscaping, irrigation, hardscaping, lighting, conduit, signing, pavers for roadway, crosswalk, and sidewalk accents, concrete sidewalk, replacement of potable water mains, replacement of gravity sewer systems, replacement of laterals/service connections, and rehabilitation in disturbed areas outside the limits of reconstruction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents