Similar Projects
Payson City 100 South Pressurized Irrigation Waterline Project
Infrastructure
Bidding
Payson, UT 84651

North Industrial Water and PI Improvements
Infrastructure
Bidding
$1,800,000 to $2,200,000 est. value
Spanish Fork, UT

River Bottom Improvement Project Prequalification
Post-Bid

Pressurized Irrigation Extension Project 2021
Post-Bid
Mapleton, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

200 South Water Main Improvements
Results
$3,000,000 to $3,400,000 est. value
American Fork, UT 84003

Woodland Hills Waterline Replacement - Phase 2A
Infrastructure
Post-Bid
Woodland Hills, UT

36" Culinary Water Line Replacement Project Segment 2
Results
Less than $10,051,493 est. value
American Fork, UT 84003

CM/GC for Cold Springs Transmission Pipeline Rehabilitation 2021
Infrastructure
Post-Bid
Spanish Fork, UT

Mill Ditch Project
Results
Less than $1,665,895 est. value
Pleasant Grove, UT 84062

Contractor Pre-Qualification Packet - Reuse Project
Infrastructure
Post-Bid
Orem, UT 84058

2020 Waterline
Results
$1,700,000 to $1,900,000 est. value
Orem, UT

2021 CDBYI Project (Community Development Building Yard Improvements)
Infrastructure
Post-Bid
Eagle Mountain, UT 84005

2020 2000 South PRV Project
Results
Orem, UT 84058

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Last Updated 03/01/2022 02:08 PM
Project Title

1000 South Water Main Replacement and Storm Drain Improvements

Physical Address View project details and contacts
City, State (County) Springville, UT 84663   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the 1000 South Water Main Replacement and Storm Drain Improvements (400 East to 1200 East) project. The installation of approx. 4,380 lf of new 12-inch PVC water main on 1000 South from 400 East to 1200 East, connecting to the existing water main at each end and connecting all intersecting mains from adjacent side streets (approx. 15 lf of 10-inch main, 350 lf of 8-inch main, 250 lf of 6-inch main and 50 lf of 4-inch main); replacement of (59) 1-inch water services and (1) 2-inch water and connecting to the new to main; and installing 9 new fire hydrants. Work shall also include the construction of approx. 555 LF of new 15-inch RCP storm drain, 80 lf of 18-inch RCP storm drain, 2400 lf of 24-inch RCP, 195 lf of 12-inch HDPE storm drain, (9) 60-inch storm drain manholes, (5) new storm drain curb face inlets and (1) storm drain combo box inlet. Additionally there will be some ancillary concrete work (curb, gutter and waterway replacement), and requisite roadway excavation and asphalt “T” patch.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents