Similar Projects
Metal Bridges Painting Treatment - Phase 2
Infrastructure
Sub-Bidding
$1,300,000 CJ est. value
Irvine, CA 92606

Metal Bridges Painting Treatment - Phase 2
Infrastructure
Sub-Bidding
$1,300,000 CJ est. value
Irvine, CA 92606

On-Call Painting Services
Alteration
Post-Bid
Newport Beach, CA

SB Minor B Striping Modification of Existing Crosswalk
Infrastructure
Post-Bid
$267,823 CJ est. value
Fullerton, CA 92832

Complete Exterior Painting at Various Sites
Alteration
Results
$490,000 est. value
Costa Mesa, CA 92626

Fullerton Union High School Exterior Painting
Alteration
Results
$550,000 est. value
Fullerton, CA 92832

Streetlight Pole Painting and Restoration Services
Term Contract
Post-Bid
Newport Beach, CA 92663

Maintenance Painting at Various Sites
Alteration
Results
$200,000 est. value
Costa Mesa, CA

Multipurpose Room Interior Paint at Canyon High School
Renovation
Post-Bid
$300,000 CJ est. value
Anaheim, CA 92807

Exterior Painting - Multiple Sites
Alteration
Results
$300,000 est. value
Costa Mesa, CA

Exterior Paint at Maple Elementary School
Renovation
Post-Bid
$200,000 CJ est. value
Fullerton, CA 92832

Interior Painting at City Yard, Building A
Renovation
Results
$97,378 CJ est. value
Santa Ana, CA 92703

Paint and Related Supplies
Term Contract
Post-Bid
Tustin, CA 92780

Orange Coast College Student Success Center (4 Buildings) Painting Project
Renovation
Results
$122,000 CJ est. value
Costa Mesa, CA 92626

Campus Wide Exterior Paint Project at Irvine Valley College
Renovation
Results
$177,000 CJ est. value
Irvine, CA 92618

Last Updated 10/11/2023 10:24 AM
Project Title

Saddleback College Learning Resource Center, Health Sciences Buildings Painting Project.

Physical Address View project details and contacts
City, State (County) Mission Viejo, CA 92692   (Orange County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $320,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Online Q&A Yes Q&A Deadline 10/25/2023 5:00 PM (PDT) Learning Resource Center the 1 st floor Complete preparation and repaint of the corridor areas on Health Sciences Complete 1st - 2nd floors preparation and repaint of the corridors on the Science Building Complete preparation and repaint of the corridor areas for 1 st - 3 rd floors. The lobby areas walls to be painted to a specific height. 10ft from FF Complete Preparation Prep. Includes patching, sanding, texturing, covering of surrounding areas ,removal of light switches, pencil sharpeners, removing wall art, photos, (do not remove glass display cases), protecting surrounding areas. The Painting Contractor shall provide all paints, labor, tools, and supplies to perform a complete repaint of all interior surfaces of the above projects as specified. B. The Painting Contractor shall cooperate with the District in every way, which shall include conducting the work at a time as agreed upon. C. Damage to existing property, of any nature, caused by the Painting Contractor shall be repaired to the satisfaction of the property owner at the Painting Contractor's expense.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents