Similar Projects
Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

CNG Head Quarters / CNG Office Building
Renovation, Infrastructure
Design
$2,400,000 est. value
San Antonio, TX

Cornerstone Commerce Center
New Construction, Infrastructure - 413,173 SF
Design
$32,067,840 est. value
San Antonio, TX 78219

Perimeter Road Package 4 (San Antonio International Airport)
Infrastructure
Bidding
$6,153,000 est. value
San Antonio, TX

Repair Schofield Road
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
San Antonio, TX 78234

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

SW Clinic Re-Pavement Project
Renovation
Post-Bid
San Antonio, TX 78237

Main Sanitary Sewer Lateral Inspection & Repair & Related Work
Results
San Antonio, TX 78249

Pumping and Hydrojetting of Grease Traps Services
Results
Less than $47,898 est. value
San Antonio, TX 78214

Hazard Elimination and Safety
Infrastructure
Bidding
$2,005,549 est. value
San Antonio, TX

Borchers Drive Reconstruction from Deer Grove Drive to Ackerman Road
Infrastructure
Post-Bid
$545,000 est. value
Kirby, TX 78219

VMC Asphalt Parking Lots Improvements
Results
San Antonio, TX 78212

SL 368 - Hazard Elimination and Safety
Infrastructure
Bidding
$1,606,167 est. value
San Antonio, TX 78209

Final Cleaning, Signage, Wall Graphics, Landscaping and Unit Paving
Infrastructure, Alteration
Post-Bid
San Antonio, TX 78204

Braun Road Sidewalks
Results
$1,100,000 est. value
San Antonio, TX 78200

Last Updated 06/27/2022 04:13 AM
Project Title

Street Maintenance Year 5

Physical Address View project details and contacts
City, State (County) Leon Valley, TX 78240   (Bexar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $240,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide sidewalk ramp improvements to two (2) curb ramps on Forest Moss Street, two (2) curb ramps on Forest Wood Street, and ten (10) curb ramps on Seneca Drive. Adjust sanitary sewer manholes and water valves along certain streets. Remove and replace cross walk pavement markings at Forest Ridge. Remove and replace the sidewalk on four alley driveways along Evers Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Painted Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents