Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Design
$150,000,000 CJ est. value
Goodyear, AZ 85338

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

RFQ Construction Manager at Risk - Site 20 New Reservoir Construction
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

South Recharge Phase II
Results
Less than $8,300,000 est. value
Gilbert, AZ 85233

Grand Canyon Airport Construction For Runway Shoulders And Drainage
Infrastructure
Results
Phoenix, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

RFQ Design - Northeast Public Safety Facility
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Mesa, AZ 85207

Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

AutoZone #3000 / Phoenix
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Phoenix, AZ 85254

Monterey Park Expansion
Infrastructure
Post-Bid
$5,729,645 CJ est. value
Mesa, AZ 85201

Last Updated 01/04/2023 01:09 PM
Project Title

Lindsay Reservoir Cover Replacement

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85201   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Removal and Replacement of the Aluminum Cover on the 10 million gallon fresh water tank approximately 77,400 square feet. Removal and replacement of the primary steel structure below the cover. Some existing electrical infrastructure will need to be removed and reinstalled. Concrete walls and liners to be protected in place.The Engineer's Estimate range is $4,500,000 to $5,000,000. For all technical, contract, bid-related, or other questions, please contact Stephanie Gishey at stephanie.gishey@mesaaz.gov.Work shall be completed within 300 consecutive calendar days, beginning with the day following the starting date specified in the Notice to Proceed. Bids must be submitted on the Proposal Form provided and be accompanied by the Bid Bond for not less than ten percent (10%) of the total bid, payable to the City of Mesa, Arizona, or a certified or cashier's check. PERSONAL OR INDIVIDUAL SURETY BONDS ARE NOT ACCEPTABLE The successful bidder, simultaneously with the execution of the Contract, will be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price, and the most recent ACORD(R) Certificate of Liability Insurance form with additional insured endorsements The right is hereby reserved to accept or reject any or all bids or parts thereto, to waive any informalities in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with the City of Mesa *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

77,400 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents