Similar Projects
Phil Welch Stadium Grandstand Concrete - 250670 - City of Saint Joseph
Renovation, Infrastructure
Conception
Less than $400,000 est. value
Saint Joseph, MO 64503

Concrete Block Work in Cell Addition
Renovation
Design
$375,000 CJ est. value
Ava, MO 65608

Concrete Maintenance and Repair
Term Contract
Design
Blue Springs, MO 64015

Columbia Sports Fieldhouse Expansion - Phase II
New Construction, Infrastructure
Bidding
$5,800,000 CJ est. value
Columbia, MO 65201

Master Meter to Highway 59 Waterline Improvements Public Water Supply District No. 3 Andrew County
Infrastructure
Bidding
$513,000 CJ est. value
Savannah, MO 64485

Seal Coat - Route E
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Auxvasse, MO 65231

Ready Mix Concrete
Term Contract
Post-Bid
Potosi, MO

Sunset Hills Selected Slab Replacement Package
Alteration
Post-Bid
$800,000 est. value
Sunset Hills, MO

2022 Concrete Repair and Restoration
Alteration
Results
$200,000 est. value
Breckenridge Hills, MO 63114

Concrete and Asphalt Repair/Replacement
Infrastructure, Alteration
Results
$100,000 est. value
Florissant, MO

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

2022 Hazelwood Asphalt Improvements Project
Infrastructure
Construction
$320,000 CJ est. value
Hazelwood, MO 63042

Regional Workforce Innovation Center
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Foristell, MO 63348

2022 District Concrete Bid
Renovation, Term Contract, Alteration
Post-Bid
$80,000 est. value
Wentzville, MO 63385

2022 Concrete Projects
Alteration
Results
$400,000 est. value
Riverside, MO

Last Updated 09/15/2023 12:06 PM
Project Title

Ada Improvements - Route K

Physical Address View project details and contacts
City, State (County) Chillicothe, MO 64601   (Livingston County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J1S3393 Route B, D, DD, K LIVINGSTON County. ADA improvements on Route K in Chula, on Route D and DD in Ludlow, and on Route B in Wheeling, the total length of improvement being 0.79 miles. Range: $1M to $2.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. Contract Time: 12/1/24 DBE Goal Percent: 3.00 MO DOT- A02 - Ada Improvements - Route K *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents