Similar Projects
Shapiro North Apartments Phase I
New Construction
Construction
Washington, DC 20002

The Park at NoMa Green
New Construction
Construction
Washington, DC 20002

Construction Management at-Risk Services Benning Park Community Center
Post-Bid
Washington, DC 20019

FY20 RiverSmart Schools Schoolyard Retrofit Project
Post-Bid
Washington, DC 20032

Construction Management at Risk Services Hardy Park and Recreation Center
Results
Washington, DC 20007

Playground Furniture, Fixtures, and Equipment, and Installation Services
Post-Bid
Washington, DC 20017

Replace Natural Grass Athletic Field With Synthetic Turf
Post-Bid
$2,500,000 to $3,600,000 est. value
Washington, DC 20008

Educare at IDEA
New Construction, Build-Out - 12,779 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Washington, DC 20019

Primrose School
Build-Out - 16,940 SF
Construction
Washington, DC 20002

Buzzard Point - Phase I
New Construction - 95,000 SF
Conception
Washington, DC 20003

Buzzard Point - Phase II
New Construction
Conception
Washington, DC 20003

Last Updated 10/14/2020 04:28 PM
Project Title

Construction Services to Preserve and Protect Meridian Hill Park Phase 5 & 6

Physical Address View project details and contacts
City, State (County) Washington, DC   (District of Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The scope includes restoration and rehabilitation of the Lower Plaza of Meridian Hill Park. The exposed aggregate concrete at this park is an important design element and much of this work centers on its replacement, repair, or replication. This includes, installation of an accessible route into the Lower Plaza of the park from 16th street, replacement of drainage lines for better drainage of the site and plaza, removal and replacement of 8 large trees, removal of sections of exposed aggregate paving, install root barriers and tree root/storm water under pavement infrastructure, and reset or replicate paving on top, repair exposed aggregate concrete, build and install a steel pleaching frame for the linden allee, repointing and sealing of joints on the Buchanan Memorial, update electrical and light fixtures at reflecting pool, mitigation of water penetration along the Great Wall stairs into rooms below, and replanting of trees and shrubs.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents