Similar Projects
2022 Street Improvements - Rebid
Infrastructure
Results
$394,494 CJ est. value
Adrian, MN 56110

Crailsheim Storage Building
New Construction
Post-Bid
Worthington, MN 56187

CSAH 10 and CSAH 35 Road Improvements
Infrastructure
Results
$696,045 CJ est. value
Worthington, MN 56187

Education Addition - 2023 Bond - Round Lake-Brewster School
Addition, Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$30,480,000 CJ est. value
Brewster, MN 56119

Education Addition - 2023 Bond - Round Lake-Brewster School
Addition, Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$30,480,000 CJ est. value
Brewster, MN 56119

Library Remodel - Nobles County
New Construction, Infrastructure - 60,000 SF
Conception
$41,000,000 CJ est. value
Worthington, MN 56187

Indoor Recreation Facility - City of Worthington
New Construction, Infrastructure - 27,000 SF
Pending Verification
$7,000,000 CJ est. value
Worthington, MN 56187

Watershed - Independent School District 518
Infrastructure
Pending Verification
$1,200,000 CJ est. value
Worthington, MN 56187

Elevated Water Storage Tank Construction
Demolition, New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Rushmore, MN 56168

Bridge (BR) 89247 Replacement - CSAH 18 Over Okabena Creek
Demolition, New Construction, Infrastructure
Results
$945,194 CJ est. value
Lorain Township, MN 56119

2023 Sanitary Sewer CIPP Lining
Infrastructure
Post-Bid
$434,714 CJ est. value
Worthington, MN 56187

2023 Parking Lot Improvements - Municipal Liquor Store
Infrastructure
Results
$223,464 CJ est. value
Worthington, MN 56187

Cecilee Street Townhomes
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Worthington, MN 56187

Sunset Park Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Worthington, MN 56187

Bituminous Apron Pavement Maintenance
Infrastructure
Bidding
$54,250 CJ est. value
Worthington, MN 56187

Last Updated 03/07/2023 09:11 AM
Project Title

PK-2 / Community Education Facility / Worthington Independent School District 518

Physical Address View project details and contacts
City, State (County) Worthington, MN 56187   (Nobles County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected November 2021
Bids Due View project details and contacts
Estimated Value $18,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.dglobe.com/news/education/7274837-District-518-working-on-a-master-plan-for-its-Crailsheim-Road-site Heard informational updates on the school's building projects. Work on the intermediate school's exterior is set for completion in the next week, allowing it to be closed for interior work. Workers are in the process of installing footings for the Community Education building, with steel for the building likely arriving some time in January. The District is deciding between wood and metal materials for its storage facility, and plans are being drawn up for the expansion of the district offices as well. -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Plans call for the construction of an approximately 45.200 square foot community education facilty with a planned approximately 3,600 square foot addition. The development will also include an approximately 4,000 square foot storage shed. The project will appear before Worthington City Council requesting conditional use permit on May 10, 2021. An architect has been selected. The project is anticipated to be advertised for bids in July/ August 2021, with construction to follow.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 50,100 SF - 42,500 SF. 3,600 SF. 4,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents