Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

250 KVA Transformers
Term Contract
Sub-Bidding
Altus, OK 73523

480-Volt Switchgear and Distribution Panel Replacement Including all Power and Control Conductors / Cables
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Fort Gibson, OK

Emergency Generator Upgrade
Alteration
Post-Bid
El Reno, OK

Installation Swap-Out of Residential Electric Meters
Alteration
Results
Ponca City, OK

Muskogee Site Lights Renovation
Alteration
Results
$40,000 est. value
Tahlequah, OK 74464

Alfalfa Electric Cooperative
Term Contract
Post-Bid
OK

Repair Kitchen Electrical System B713
Alteration
Results
Enid, OK 73703

High Mast Lights
Infrastructure
Post-Bid
Elk City, OK

Repair Hangar Lighting
Term Contract
Results
$100,000 to $250,000 est. value
Enid, OK 73703

Caterpillar Generator Service
Alteration
Post-Bid
Oklahoma City, OK

Electrical Instrumentation and Control Services
Alteration
Results
Lawton, OK

Buchanan Hall Electrical Conversion
Alteration
Post-Bid
Oklahoma City, OK

STOCK: 15 kV Breakers
Alteration
Results
Chouteau, OK

Last Updated 04/05/2023 02:22 PM
Project Title

West Pump Station Backup Generator

Physical Address View project details and contacts
City, State (County) Sapulpa, OK 74066   (Creek County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $463,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 16, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The existing West Pump Station houses a total of six (6) high service potable water pumps, each 150 HP, serving two different pressure planes in Sapulpa. The proposed backup generator will provide emergency backup power for up to three (3) pumps. The proposed generator is a 500 KW, diesel fuel fed completely packaged unit with integral double-wall fuel tank. The proposed generator will be supported on an elevated concrete support pedestal. Each bidder shall accompany his original bid with a certified or Cashier's Check on a solvent bank located in Oklahoma or a Bidder's Bond, in the amount of five (5) percent of the amount bid, and the same will be retained by the County on behalf of the City until the successful bidder has entered into a written contract with the Owner and a satisfactory performance bond has been furnished. The bid deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. Each bidder shall accompany his bid with a sworn statement in writing that the Bidder has not directly or indirectly entered into an agreement, expressed or implied, with any other bidder concerning the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof. Construction, Maintenance and Statutory Payment Bonds in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract, and the bidder shall state in the proposal the name and address of the Surety or Sureties who will issue this bond in case the contract is awarded to him. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner. Funding for this project is provided through American Rescue Plan Act (ARPA) grant program. As such, compliance with Labor Standards Contract Provisions is mandatory. Compliance with the Davis Bacon Act is mandatory if the total project cost exceeds $10,000,000 (ten million dollars). This project is to be financed by the ARPA grant program. The following requirements and regulations must be complied with: A. Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Liquidated Damages:- BIDDER further agrees to pay as liquidated damages, the sum of $ 500.00 for each consecutive calendar day

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents