Similar Projects
Y1NB--552-19-107: Replace Boilers (Building 147)
Design
$5,000,000 to $10,000,000 est. value
Dayton, OH 45428

Boiler Inspections New Buildings
Bidding
Columbus, OH

Boiler Controls
Bidding
Columbus, OH

Replace Hot Water Heating Lines in Weight Room and Gymnasium Sinclair Community College
Post-Bid
Less than $210,000 est. value
Dayton, OH 45390

Water Meter Installation at C.J. Brown Dam & Reservoir
Post-Bid
$25,000 to $100,000 est. value
Springfield, OH 45503

Z--Replace Operating Room Chillers 539-18-203
Results
$5,000,000 to $1,000,000 est. value
Cincinnati, OH

Z--Remove Surgery Clean Steam System
Results
$25,000 to $100,000 est. value
Cleveland, OH 44106

Boiler Repair Service
Bidding
Columbus, OH

Evanston: Replace Base Board Heaters
Post-Bid
Cincinnati, OH

Servo-Hydraulic Equipment Calibration Services
Results
Cleveland, OH 44135

Boiler Replacement
Bidding
Less than $238,775 est. value
Cleveland, OH 44115

Y--1B229 Mechanical Room (VA-19-00027342)
Post-Bid
$250,000 to $500,000 est. value
Cleveland, OH 44106

34--Tin Knocker & Associated Items for the Cleveland VAMCs Engineering Department
Results
Cleveland, OH 44106

J--Chillicothe VA Medical Center Steam Trap Survey Planned Solicitation Release for Same or Similar Requirement on or About 03/01/2019 See SOW Beginning on Page 2
Post-Bid
Chillicothe, OH

Shipley Mechanical Upgrades
Results
$565,910 est. value
Columbus, OH

Reported 01/20/2019 12:00 AM
Project Title

Chiller Maintenance

Physical Address View project details and contacts
City, State (County) Dayton, OH 45433   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work consists of performing maintenance, improvements, overhaul, replacement, routine repair and emergency service calls on centrifugal, screw, scroll and reciprocating chillers, air conditioning systems, and associated cooling system components at Wright Patterson AFB, OH. Associated cooling system components include, but are not limited to water towers, ductwork and environmental control systems and interfaces.
Details
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents