Similar Projects
Road Construction IDIQ
Bidding
$25,000 to $5,000,000 est. value
New Ellenton, SC

City Maintained Street Paving 2020
Bidding
$200,000 to $300,000 est. value
Aiken, SC 29801

Site Wide Asphalt Paving/Road Work
Post-Bid
Aiken, SC 29803

Saddle Soap Lane (C-237) Dirt to Pave Project
Post-Bid
Aiken, SC

Edisto, Camp Gravatt and Emmanuel Tim Road Improvements
Results
Less than $1,820,628 est. value
SC

2018 Aiken County CTC Resurfacing
Results
SC

Roadway Relocation of Dragon Lair Road
Bidding
Aiken, SC 29801

City Street Paving-2019
Post-Bid
Aiken, SC

Milling and Surface D
Results
SC

Safe Routes to School
Bidding
Less than $400,000 est. value
Aiken, SC 29801

Bent Arrow and Wooden Drive Road Pavings
Post-Bid
Less than $1,012,470 est. value
Aiken, SC

Safety Improvements US 1/SC 118
Results
SC

2019 CPST Street Resurfacing
Post-Bid
North Augusta, SC

2019 C- Program Street Resurfacing
Results
Less than $249,071 est. value
North Augusta, SC

Walnut Lane Rehabilitiation
Post-Bid
Less than $500,000 est. value
North Augusta, SC 29841

Last Updated 01/09/2019 01:31 AM
Project Title

Shld WID, FDP, Var Mill; Resurfacing

Physical Address View project details and contacts
City, State (County) SC   (Aiken County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 375.000 Sy Removal Of Exist. Guardrail 150.000 Lf Borrow Excavation 7,814.000 Cy Excavation For Shoulder Paving 2,604.096 Sta Hauling Of Excavated Shoulder Material 2,604.096 Sta Maintenance Stone 119.930 Ton Hma Shoulder Widening Course 13,601.280 Ton Liquid Asphalt Binder Pg64-22 4,921.302 Ton Full Depth Asph. Pav. Patching 6" Unif. 11,993.000 Sy Milling Existing Asphalt Pavement (Variable) 36,102.000 Sy Milled-In Rumble Strip 64.680 Mi Hot Mix Asphalt Surface Course Type b 50,711.921 Ton Hot Mix Asphalt Surface Course Type c 9,387.884 Ton Hot Mix Asphalt Surface Course Type d 13,608.483 Ton Driveway Paving-Surface Type d 2,134.375 Ton Permanent Construction Signs (Ground Mounted) 7,324.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 26,498.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 270,410.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 4,120.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 350.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 20.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 2,372.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 9.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 4.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 14,100.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 269,420.000 Lf 6" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 4,120.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 26,758.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 336,530.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 4,120.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 350.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 2,774.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 9.000 Ea White Word Message "Only"-Fast Dry Paint 4.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 2.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 18,480.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 308,460.000 Lf 6"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 4,120.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 2,795.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 165.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 40.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 466.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 66,120.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 402.000 Lf 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 4,380.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 39,040.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 1,034.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 3,040.000 Ea Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 2,720.000 Lf Sawcut For Loop Detector 800.000 Lf Detectable Warning Material 187.500 Sf Pedestrian Ramp Construction 375.000 Sy Surface Applied Detectable Warning 330.000 Sf Steel Beam Guardrail Steel Beam Gr. 200.000 Lf Steel Beam Guardrail (Thrie) 125.000 Lf Reserved Use 8057100 7.000 Ea Permanent Grassing For Small Projects 37.886 Acre
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents