Similar Projects
11th Avenue South East and 5th Street Sanitary Sewer and Storm Sewer Improvements
Conception
$110,000 est. value
Cedar Rapids, IA 52407

Edgewood Road (W/O) Prairie Creek (S/O) Sanitary Sewer Extension
Conception
$1,500,000 est. value
Cedar Rapids, IA

Nevada Avenue Sanitary Sewer Replacement
Infrastructure
Bidding
Less than $462,000 est. value
Iowa City, IA 52240

Orchard Street Reconstruction
Infrastructure
Bidding
$1,220,000 est. value
Iowa City, IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

FY 2021 CIP Pipelining Phase IVA2
Infrastructure
Post-Bid
Waterloo, IA

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

2021 CIPP Sanitary Sewer Lining
Results
$542,510 est. value
Earling, IA

E Avenue North East from 19th Street to 20th Street
Conception
$1,650,000 est. value
Cedar Rapids, IA 52402

Joint Sanitary Sewer Rehabilitation
Infrastructure
Bidding
Panorama Park, Riverdale, IA

Southeast Area Sewer Rehabilitation
Infrastructure
Post-Bid
$755,000 est. value
Grinnell, IA

20th Street NE East of B Avenue Sanitary Sewer Extension
Results
$120,000 est. value
Cedar Rapids, IA

C Avenue North East, West and North of East Robins Road Sanitary Sewer Extension
Conception
$400,000 est. value
Cedar Rapids, IA 52407

Mount Pleasant Northeast Lagoon Conversion
New Construction, Infrastructure
Bidding
Mount Pleasant, IA

A Street South West from 1st Street to Bowling Street Sanitary Sewer Lining
Results
Less than $3,220,000 est. value
Cedar Rapids, IA 52404

Last Updated 08/06/2021 06:58 AM
Project Title

Little Walnut Creek North Trunk Sewer Extension Phase 1 Completion

Physical Address View project details and contacts
City, State (County) Waukee, IA   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Little Walnut Creek North Trunk Sewer Extension – Phase 1 Completion including all labor, materials and equipment necessary for approximately 3,100 linear feet of 24-inch diameter sanitary sewer in open cut and installed within existing casing pipe, 90 linear feet of 24-inch diameter sanitary sewer augured in steel casing, manholes, excavation and backfill, surface restoration and miscellaneous associated work, including cleanup.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents