Similar Projects
High-Capacity, Mobile Stormwater Pumps Project
Infrastructure
Bidding
Southwest Ranches, FL 33331

Rebuilding of Three (3) Stormwater Water Lubrication Pumps
Infrastructure
Bidding
Southwest Ranches, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Post-Bid
FL

Raw Water Well #9
Results
Hallandale, FL 33009

Reverse Osmosis Membrane Feed Pump and Motor
Results
Less than $275,000 est. value
Davie, FL 33314

Transfer Pump Removal, Repair and Reinstallation
Alteration
Post-Bid
Parkland, FL

Peele-Dixie Water Treatment Plant Injection Well Mechanical Integrity Test
Results
Fort Lauderdale, FL 33317

Rehabilitation of Deep Injection Wells
Infrastructure
Post-Bid
$800,000 est. value
Miramar, FL 33025

Purchase of a Grundfos Submersible Pump
Results
Davie, FL

Irrigation Pump System
Infrastructure
Post-Bid
Fort Lauderdale, FL 33325

Reclaimed Water Treatment Plant (RWTP) - Piping Modification and Production Improvements
Results
Pompano Beach, FL 33062

Mechanical Integrity Testing and Repairs Services for Deep Wells
Term Contract
Results
Sunrise, FL 33351

Mechanical Integrity Testing of the Wastewater Treatment Plant Injection Wells
Results
Less than $120,000 est. value
Pembroke Pines, FL 33027

SBDD Rebuilding of Stormwater Pumps
Results
Southwest Ranches, FL 33331

Last Updated 10/06/2021 03:16 AM
Project Title

Wastewater Reclamation Facility Monitor Well No. 2

Physical Address View project details and contacts
City, State (County) Miramar, FL 33027   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes but is not limited to, providing all labor, materials, machinery, tools, equipment and incidentals, as necessary for to: (1) clean and investigate monitoring well no.2 integrity, and; (2) if needed, modify the LMZ 6-5/8-inch casing with FRP tubing.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents