Similar Projects
Sewer Pump Station Rehabilitation
Renovation
Bidding
Kingston Springs, TN

Pump Station Safety Improvements Part 1 Brainerd Golf Course Pump Station Safety Improvements
Post-Bid
Chattanooga, TN 37405

Part 2 Selected Pump Station Safety Upgrade Smurray Hills 5 and Brainerd Manor
Post-Bid
Chattanooga, TN 37402

23rd Street Pump Station Elevator Upgrade
Results
Less than $136,065 est. value
Chattanooga, TN 37402

Dupont Pump Station and Basin Improvements - Phase 2(Contract B)
Results
Less than $4,532,420 est. value
Chattanooga, TN 37402

Sewer System Improvements Express Mart Pump Station Replacement
Post-Bid
TN 37847

Sequatchie Water Booster Pump Station
Results
Jasper, TN 37347

GRSM 158579/202623 - Look Rock Rehabilitation
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Maryville, TN

Upgrade of Green Gap and Roy Lane Pump Stations
Results
Chattanooga, TN

Gibson Creek Equalization Facility
New Construction
Post-Bid
Nashville, TN 37115

Sewer System Improvements - Sewage Pumping Station Replacement at WWTP
Results
Pulaski, TN

Franklin Southeast Basin Pilot Treatment Facility and Redwing Reclaimed Water Pump Station
New Construction
Post-Bid
Franklin, TN

2018-19 Lift Station Phase-Out
Renovation
Results
Johnson City, TN

Lift Station 8 and 9 Replacement
New Construction
Post-Bid
Lexington, TN

2020 ARC Project for Clayton Homes Pump Station and Force Main Conveyance
New Construction
Results
Rutledge, TN

Reported 06/05/2021 12:00 AM
Project Title

Pump Station No. 30

Physical Address View project details and contacts
City, State (County) Clinton, TN   (Anderson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists generally of the renovation of Pump Station No. 30 including new pumps and drives with controls, associated pipework, and wet-well rehabilitation

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents