Similar Projects
Dain’s Lumber Phase 1
New Construction, Infrastructure - 7,000 SF
Conception
$800,000 CJ est. value
Cold Spring, NY 10516

Patterson Crossing Mixed-Use
New Construction, Infrastructure - 418,220 SF
Design
$50,000,000 CJ est. value
Kent Lakes, NY 10512

Stillwater Business Park
New Construction, Infrastructure - 17,052 SF
Design
$3,600,000 CJ est. value
Mahopac, NY 10541

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Cross-County Sanitary/Kessman Landfill Site
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Patterson, NY 12563

Highway Job Order Contract
Infrastructure
Results
$1,300,000 est. value

Carmel Centre Senior Housing
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carmel, NY 10512

Sutton Place Office Addition
Addition, Infrastructure
Pending Verification
$500,000 CJ est. value
Brewster, NY 10509

Barrett Hill
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Brewster, NY 10509

On Call Pavement Repairs on Various County Roads
Infrastructure
Post-Bid
Carmel, NY 10512

ADA Compliance and Pedestrian Signal Upgrades
Infrastructure
Results
$800,000 est. value
Chautauqua, Clymer, Cold Spring, Dayton, Holland, Lewiston, Lockport, Mayville, Newfane, North Tonawanda, Ripley, Salamanca, Sardinia, Sherman, South Dayton, Tonawanda, NY

Verizon / Southeast (Brewster)
New Construction, Infrastructure
Pending Verification
$300,000 CJ est. value
Brewster, NY 10509

Replacement of Water Meter Endpoints
Infrastructure
Post-Bid
$300,000 CJ est. value
Cold Spring, NY 10516

ADA Compliance and Signal Upgrades
Infrastructure
Results
$1,500,000 est. value
Cold Spring, Franklinville, Little Valley, Mayville, Portville, Ripley, Salamanca, Sherman, South Dayton, Westfield, NY

Last Updated 05/30/2023 03:22 PM
Project Title

Stepping Stones Daycare Addition

Physical Address View project details and contacts
City, State (County) Cold Spring, NY 10516   (Putnam County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Pre-School/Daycare, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the 1,820 square foot addition to an existing daycare center. As of May 30, 2023, this project is under review with the Philipstown Planning Board. Construction could begin in fourth quarter 2023.

Details

1,820 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents