Similar Projects
Pinecrest Academy Gymnasium
New Construction, Addition - 12,651 SF
Conception
Miami, FL 33185

Belen Jesuit Preparatory School Athletic Facility
New Construction - 52,145 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Miami, FL 33184

Shelton Academy
Renovation, Addition - 82,987 SF
Design
Doral, FL

Hialeah Gardens Elementary School Addition and Renovations
Renovation, Addition
Design
Less than $1,945,535 est. value
Hialeah Gardens, FL 33018

Comstock Elementary School
Addition
Post-Bid
Miami, FL 33142

Golden Glades Elementary - Interior and Exterior Renovations
Renovation
Post-Bid
$2,000,000 est. value
Opa-locka, FL 33054

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement
Renovation
Results
Less than $4,143,452 est. value
Hialeah, FL 33012

New Elementary School (K-5) - (A Reuse of Doral Grand Bay K-8, Phase I)
New Construction - 50,000 SF
Results
Miami, FL 33187

Palmer Trinity School - Classroom Building
New Construction - 2,100 SF
Construction
$500,000 to $1,000,000 CJ est. value
Palmetto Bay, FL

Temple Beth Am - Classroom Building
New Construction - 8,200 SF
Construction
Pinecrest, FL

Destination Sport
New Construction
Conception
Less than $150,000,000 est. value
Doral, Miami, FL 33172

Mater Academy
New Construction
Design
Hialeah Gardens, Miami, FL 33018

Fairlawn Elementary School New Addition and Renovation
Renovation, Addition
Post-Bid
Miami, FL 33144

Nathan B. Young Elementary School Renovations
Renovation
Results
Opa-locka, FL

Caribbean K-8 Center Addition
Addition
Construction
Miami, FL 33177

Last Updated 10/13/2021 02:26 PM
Project Title

Center For Jewish Life

Physical Address View project details and contacts
City, State (County) Miami, FL 33129   (Miami-Dade County)
Category(s) Education, Entertainment/Recreation, Religious/Funeral
Sub-Category(s) Athletic Facility, Elementary School, Religious Facility
Contracting Method Bids by Invitation.
Project Status Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Religious Facility, New Construction, Athletic Facility, Elementary School.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents