Similar Projects
Route 82 Safety Improvement Phase 2 - Connecticut Department of Transportation
Infrastructure
Conception
$20,400,000 CJ est. value
Norwich, CT 06360

West Main Street Watermain Replacement - Norwich Public Utilities
Infrastructure
Conception
$8,000,000 est. value
Norwich, CT 06360

National Coast Guard Museum
New Construction, Infrastructure - 80,000 SF
Design
$100,000,000 CJ est. value
New London, CT 06320

Breeze Car Wash
Demolition, New Construction, Infrastructure - 3,050 SF
Design
$700,000 CJ est. value
Waterford, CT 06385

Ledyard High School Multi-Use Pathway and Sidewalk Extension
Infrastructure
Bidding
$2,674,800 CJ est. value
Ledyard, CT 06339

Griswold Sewer Extension Project
Infrastructure
Bidding
$1,163,000 CJ est. value
Griswold, CT 06351

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

National Coast Guard Museum (NCGM) - Bulkhead and Fill
Infrastructure
Post-Bid
$1,000,000 CJ est. value
New London, CT 06320

Water Street at Ferry Street and Governor Winthrop Boulevard Traffic Signal Improvements
Infrastructure
Results
$891,405 CJ est. value
New London, CT 06320

Runway 6/15 - Off Airport Obstruction Removal Bradley International Airport
Infrastructure
Results
$1,891,750 CJ est. value
Windsor Locks, CT 06096

The Great Wolf Lodge at Mashantucket
Demolition, New Construction, Infrastructure - 90,000 SF
Construction
$300,000,000 CJ est. value
Ledyard, CT 06338

New London Community Recreational Center
New Construction, Infrastructure - 57,000 SF
Construction
$15,000,000 CJ est. value
New London, CT 06320

Delamar Hotel / Mystic - Revised
New Construction, Infrastructure - 29,868 SF
Pending Verification
$15,000,000 CJ est. value
Mystic, CT 06355

Oswegatchie Hills Affordable Housing
New Construction, Infrastructure
Pending Verification
$317,000,000 CJ est. value
East Lyme, CT 06333

Route 82 Safety Improvement Phase 1 - from Banas Court to Fairmont Street, City of Norwich - Connecticut Department of Transportation
Infrastructure
Conception
$20,000,000 CJ est. value
Norwich, CT 06360

Last Updated 10/13/2023 06:02 PM
Project Title

Water Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Griswold, CT 06351   (New London County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct and install a 500,000-gallon multi-column elevated water storage tank off Barber Road with a submersible mixer and level control as well as 2,300 LF of 12-inch HDPE to the multicolumn water storage tank and 4,500 LF of 12-Inch ductile iron pipe on Preston Road (Route 164) and Barber Road with bridge crossing of I-395 to connect with the Jewett City Water Companys existing drinking water distribution system. It is the sole responsibility of the bidder to ensure that the bid is in the hands of the proper authority prior to the bid opening time. Alternate 2: Construct bituminous concrete driveway along slope of driveway up to the water tank site. Addenda, if issued, will be posted Electronically and shall be accompanied by e-mail notification to every individual or firm on record as having received the Bid Documents. It shall be the sole responsibility of the Contractor to ascertain the existence of any and all addenda. Hard copies of the addenda will not be mailed or faxed. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. State Set-aside and Compliance :This contract is subject to state set-aside and contract compliance requirements. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents