Similar Projects
Rooftop Unit Replacement
Renovation
Sub-Bidding
$340,000 CJ est. value
Riverton, UT 84065

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Post-Bid
Salt Lake City, UT

Salt Lake City ATCT CRAC Unit Optimization
Term Contract
Results
$100,000 to $300,000 est. value
Salt Lake City, UT 84116

Rooftop HVAC Units
Alteration
Results
Riverton, UT

Airport Operations Center HVAC
Alteration
Post-Bid
Salt Lake City, UT 84122

SLCo CGC IT Cooling Tower Replacement
Alteration
Results
$90,000 to $100,000 est. value
Salt Lake City, UT 84114

University Of Utah Generator And Switches
Term Contract
Post-Bid
Salt Lake City, UT 84112

Kitchen Vent Hood Cleaning
Term Contract
Results
Herriman, Riverton, UT 84096

BEH S 025 AHU 1 System Upgrade
Alteration
Post-Bid
$190,217 est. value
Salt Lake City, UT 84112

Channing Hall Rooftop Unit Replacement
Alteration
Results
Draper, UT 84020

Install Rooftop HVAC Units
Alteration
Post-Bid
Riverton, UT

ASB HVAC Improvements
Alteration
Results
$114,655 est. value
Salt Lake City, UT 84112

4200 Pump Station Air Conditioning
Alteration
Post-Bid
Riverton, UT 84096

Construction Granger High Shop Air Filtration
Alteration
Results
West Valley City, UT 84119

Last Updated 03/21/2023 01:06 PM
Project Title

Replacement of Chiller and Boilers at Rose Wagner Center

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84101   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $790,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 21 the project was canceled. Salt Lake County Contracts and Procurement, on behalf of Facilities Management invites your company to bid on project Rose Wagner HVAC Upgrade located at 138 W. Broadway, Salt Lake City UT per the attached specifications. Bond Range $700,000 to $790,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. There will be a $350.00 charge per calendar day for liquidated damages

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents