Similar Projects
Demolish the Jonesboro Library and the Human Resources Building
Demolition
Bidding
$70,000 est. value
Jonesboro, GA 30236

GEFA Sanitary Sewer Improvements
Infrastructure
Bidding
$600,000 est. value
Metter, GA

Abatement and Demolition Services
Demolition
Post-Bid
Lyons, GA 30436

Demolition Of Two Residential Buildings
Post-Bid
Bainbridge, GA 39819

Splost North Mainland Phase III Force Main Improvement
Results
Less than $2,800,000 est. value
Brunswick, GA 31520

Demolition of Sheraton Hotel Complex
Results
College Park, GA 30303

Demolition - 319 General Courtney Hodges Boulevard
Demolition
Bidding
$70,000 est. value
Perry, GA 31069

Mitigation Stream Credits
Post-Bid
GA

Septic Tank and Grease Trap Maintenance Services Countywide
Term Contract
Results
Atlanta, GA 30349

Lift Station 13 and 15 Separation and Force Main Improvements
Renovation
Bidding
$1,100,000 est. value
Saint Marys, GA 31558

Abatement and Demolition Services
Demolition
Post-Bid
Blairsville, Young Harris, GA 30512

2019 CDBG Sanitary Sewer Improvements
Results
Less than $503,286 est. value
Vienna, GA 31092

170 Cox Road Demolition Project
Demolition
Bidding
$30,000 est. value
Roswell, GA 30075

North Park Street Demolition
Demolition
Post-Bid
Dahlonega, GA 30533

Sanitary Sewer System Improvements, 9th Street Area
Results
Vidalia, GA 30474

Reported 06/24/2022 12:00 AM
Project Title

Fieldstone Pump Station Elimination Project

Physical Address View project details and contacts
City, State (County) Conyers, GA 30013   (Rockdale County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Demolition, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $648,222 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this contract consists of, but is not limited to, the decommission of fieldstone pump station and construction, and installation of 8 inch sanitary sewer lines, manholes, associated site work, erosion and sedimentation control, and other appurtenances. Fieldstone Pump Station is a dry pit/wet arrangement where the pumps, discharge piping and valves are located in the dry pit structure. There is piping from the dry pit to the wetwell. The wetwell in this project will be converted to a sewer manhole. The wetwell is designated as Existing MH1 on the drawings.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents