Similar Projects
Hydraulic and Hydrological Evaluation of City Storm Sewers, Combined and Sanitary
Alteration
Bidding
Dearborn, MI

M-139 Sewer Extension to Valenti Development Project
Alteration
Bidding
Saint Joseph, MI

Catch Basin Cleaning
Post-Bid

Catch Basin Cleaning
Post-Bid

North Interceptor East-Arm PCI-4 Rehabilitation Contract No-1
Results
Waterford, MI 48328

East Ramp Storm Water Diversion
Results
Less than $768,817 est. value
Ypsilanti, MI 48198

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

Combined Sewer Separation
Alteration
Bidding
$364,410 est. value
Ecorse, MI

Storm/Sanitary Drain Piping Replacement
Post-Bid
$1,000,000 to $3,000,000 est. value
Detroit, MI

State Highway US-41 Storm Sewer Repair
Results
Less than $52,285 est. value
Ishpeming, MI 49849

Greenfield-Jerome Area Sewer Separation (2022-025)
Alteration
Bidding
Dearborn, MI

Lakewood Wastewater Authority - Phase II Collection Improvements - Gravity Interceptor Sewer And Force Main
Post-Bid
Lake, MI

Parking Lot Storm Line Replacement - 2020
Results
Brighton, MI 48116

Storm, Sanitary, and Water Upgrades at Various Locations
Alteration
Bidding
Kalkaska, MI

Montgomery Drain Division VI
Post-Bid
Lansing, MI

Last Updated 04/01/2022 08:39 AM
Project Title

Klingman and Jarstfer Drain

Physical Address View project details and contacts
City, State (County) Ionia, MI   (Ionia County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Klingman & Jarstfer Drain project will be let in one section as follows, each section having the length, average depth and width as set forth: Item Estimated No. Quantity Unit Description 1. 1 Lump Sum Mobilization 2. 1 Lump Sum Hydraulically Dredging (Approx. 3,200 Cu. Yd.) 3. 1 Lump Sum Spoil Hauling 4. 4 Each Dewatering Bags 5. 1 Each Turbidity Curtain 6. 1 Lump Sum Soil Erosion and Sedimentation Control 7. 1 Lump Sum Seeding

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents