Similar Projects
Liquid Bituminous Materials (2019-2020)
Term Contract
Results
Elmira, NY

Hot Mix Asphalt Pavements (2019)
Results
NY

Time and Material Asphalt and Paving
Post-Bid
Elmira, NY 14903

Time and Material for Site Work, Paving and Materials
Post-Bid
Elmira, NY 14903

Leland Street Area Pavement Restoration Project
Post-Bid
Elmira, NY 14904

Asphalt Paving at Five Lukoil Service Stations
Renovation
Post-Bid

Roads Pavement Restoration at Various Parks
Results

Concrete Repair Materials and Protective Sealers(NYS Approved Product Materials)
Term Contract
Post-Bid

Where and when Highway Contract
Results
Less than $250,000 est. value

Phase 2 Leland Street Area Pavement Restoration
Post-Bid
Elmira, NY 14904

Crack Sealing - 2020-2021
Term Contract
Post-Bid
Elmira, NY

City of Elmira Hot Mix Asphalt Pavements
Term Contract
Post-Bid
Elmira, NY 14901

Town of Big Flats Hot Mix Asphalt Pavements
Term Contract
Post-Bid
Elmira, NY 14901

Hot Mix Asphalt (FOB) - (2020-2021)
Term Contract
Post-Bid
Elmira, NY 14901

Chemung County Hot Mix Pavements
Term Contract
Post-Bid
Elmira, NY 14901

Last Updated 03/12/2019 09:20 AM
Project Title

North Main Street Cultural Connector Reconstruction Project

Physical Address View project details and contacts
City, State (County) Elmira, NY 14900   (Chemung County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project involves full depth pavement reconstruction on West Second Street between North Main Street and Railroad Avenue, North Main Street between West Third Street and West Second Street, and on Park Place between West Clinton Road to West Third Street. A modern roundabout will be constructed at the intersection of North Main Street, Park Place, and West Third Street. New drainage will be installed for adjustment to the curb lines for the modern roundabout. Also, new signage and pavement markings will be constructed for the modern roundabout. The pedestrian signal equipment will be upgraded to meet ADA standards at the intersection of North Main Street and West Second Street and the intersection of Park Place and West Clinton Street. New sidewalks will be constructed in compliance with ADA standards throughout the project limits. Landscaping and streetscape elements would be installed. Signal systems will also be modified to ensure ADA compliance.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents