Similar Projects
2019 Gym Floor Refinish and Restoration
Post-Bid
Tampa, FL 33610

Composite Coat Floors and Containment Basins at Water/Wastewater Plants
Post-Bid
Less than $750,000 est. value
Tampa, FL 33601

Public Safety Building Repairs
Results
Less than $10,100 est. value
Callaway, FL 32404

Replace the Flooring for the Wewahitchka High School Commons Area
Results
Wewahitchka, FL 32465

Halifax Health Port Orange Hospital Flooring
Post-Bid
Port Orange, FL 32127

Replacement of Volusia County Fire Stations Concrete Floor Coatings
Results
Less than $32,895 est. value
De Land, FL 32720

Flooring Replacement for Broward Health Medical Center Atrium Building
Post-Bid
Fort Lauderdale, FL 33316

District Energy System (DES) Floor Resurfacing
Results
Jacksonville, FL 32202

Grind and Re-Coat Pavilion Floor
Post-Bid
Port Charlotte, FL 33948

Concrete Floor Grinding
Results
$100,000 to $250,000 est. value
Marianna, FL

Rubber Tile Floor Installation
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34238

North and Southwest RO WTP Coatings, Gratings, and Access Platform
Results
Cape Coral, FL 33993

Floor Sanding, Repairing and Finishing Package for Wickline Building Renovations
Post-Bid
Flagler Beach, FL

Installation of Vinyl Tile at USCG Air Station Miami
Results
Opa-locka, FL

Flooring Carpet, Tile, Vinyl and Installation
Post-Bid
Bartow, FL 33831

Reported 04/17/2021 12:00 AM
Project Title

2021 Terrazzo Flooring

Physical Address View project details and contacts
City, State (County) Saint Pete Beach, FL   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified floor contractors to perform terrazzo installation to enhance the Warren Webster Community Center's historic value. 1. The Contractor shall carefully examine the existing flooring and be familiar with the work required for the project. Contractor is responsible for field measurement and review of existing conditions. 2. Contractor will be responsible for about 2100 SF area to include kitchen, hall, office and storage area. 3. Contractor to use materials, tools, and techniques of the buildings’ era. 4. Site and surrounding properties must be kept free of debris and thoroughly cleaned upon completion. 5. The original slab to be resurfaced and prepared for a 5/8” terrazzo topping. 6. A sample will be provided for approval. 7. Honing and polishing

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents