Similar Projects
Autocamp Zion
New Construction - 8,441 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Virgin, UT 84779

The Cove at Desert Color
New Construction, Infrastructure - 29,271 SF
Design
$6,800,000 CJ est. value
St George, UT 84790

Springdale Wastewater Lagoon Improvements Headworks Powered Screen
Infrastructure
Bidding
$700,000 CJ est. value
Springdale, UT 84767

Ash Creek Pipeline Project - Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
St George, UT 84770

Springdale Wastewater Lagoon Improvements Sand Filtration
Renovation, Infrastructure
Sub-Bidding
$600,000 CJ est. value
Springdale, UT 84767

New State Bank of Southern Utah Steel Bid Package 1
New Construction, Infrastructure
Sub-Bidding
$500,000 CJ est. value
St George, UT 84790

Remodel of the Structure at 680 Zion Park Boulevard
Post-Bid
Springdale, UT 84767

2021 Slurry Seal Project
Post-Bid
Santa Clara, UT

Moenave Trail Improvements
Results

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Black Desert Resort
New Construction
Construction
Ivins, UT

Bench Lake Townhomes
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Hurricane, UT 84737

Bench Lake Townhomes
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Hurricane, UT 84737

Canyon Street Sidewalk Project
Post-Bid
Hildale, UT 84784

300 West Reconstruction from 900 South to 2100 South
Results

Last Updated 08/05/2022 06:08 PM
Project Title

Dixie Technical College - Building C North Parking Lot

Physical Address View project details and contacts
City, State (County) St George, UT 84770   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $215,798 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization/Demobilization; Field Surveying and Staking; Site Demolition and Haul-Off; 3" Thick Asphalt Pavement over 6" Thick Untreated Base Course; 4" Thick Sidewalk over 6" Base Course; Concrete Curb; ADA Handicap Ramp w/ Truncated Domes; Access Ramp; Striping; Rock Mulch; Bollard; Metal Fencing; 36-ft Metal Gate; 4-ft Man Gate; Double Head LED Light, Pole, and Base; Electrical Distribution (Includes Panel, Conductors, Conduits and Excavation). Question Submission Close Date 7/26/2022 3:00 PM MDT

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents