Similar Projects
East Main Street Rehabilitation - City of Santa Maria
Infrastructure
Conception
$2,600,000 CJ est. value
Santa Maria, CA 93454

Mahoney and Black Road Rehabilitation Project - City of Santa Maria
Infrastructure
Conception
$5,740,000 CJ est. value
Santa Maria, CA 93455

Entry Road Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Santa Barbara, CA 93110

RFP - Job Order Contracting - General Engineering
Term Contract
Bidding
Santa Barbara, CA 93101

Misc Water Supplies
Term Contract
Sub-Bidding
Lompoc, CA 93436

Job Order Contracting - General Construction
Term Contract
Sub-Bidding
Santa Barbara, CA 93101

Portable Toilet Leasing
Term Contract
Post-Bid
Lompoc, CA 93437

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Defensible Space Chipping
Alteration
Results
$22,500 est. value
Santa Barbara, CA

Installation of District Provided Portable Restroom and Existing Restroom Remodel at Fairlawn Elementary School
Renovation, Term Contract
Results
Santa Maria, CA 93458

Electric Transformers
Term Contract
Sub-Bidding
Lompoc, CA 93436

Janitorial Services
Term Contract
Post-Bid

Whole Structure Fumigation
Term Contract
Results

Snow Removal Service
Term Contract
Post-Bid

Crosswalk at Calle Real / Fairview Center Pedestrian Hybrid Beacon (PHB)
Infrastructure
Results
$464,332 CJ est. value
Goleta, CA 93117

Last Updated 08/12/2022 01:02 AM
Project Title

Annual Contract for Tree Maintenance Services

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA 93101   (Santa Barbara County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to provide grid pruning consisting of fifty or more trees in close proximity, (no separation of more than three blocks) that may include large trees, medium trees, small trees, palms or any combination thereof. Living Wages/Prevailing Wages: If there is a difference between the City's Living Wage rate and Prevailing Wage rates for similar classifications of labor, the contractor and his subcontractors shall pay no less than the highest wage rate. Online Q&A Yes Q&A Deadline 08/08/2022 12:00 PM (PDT Bid Bond 0.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting No Project Duration On going up to 5 year Contract

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents