Similar Projects
Sand Hill Road Assisted-Living Facility
New Construction, Infrastructure - 94,000 SF
Design
$23,000,000 CJ est. value
Castleton, VT 05735

Mt. Tabor Vtry(35) & Wallingford Vtry(39)
Infrastructure
Bidding
$5,000,000 CJ est. value
Mount Tabor, VT 05739

Mt. Tabor Vtry(35) & Wallingford Vtry(39)
Infrastructure
Bidding
$5,000,000 CJ est. value
Mount Tabor, VT 05739

Two Paving Projects
Infrastructure
Post-Bid
$200,000 CJ est. value
Goshen, VT 05733

Two Paving Projects
Infrastructure
Post-Bid
$200,000 CJ est. value
Goshen, VT 05733

Brattleboro-newfane STP 2940(1)
Infrastructure
Results
$10,000,000 to $25,000,000 est. value
Poultney, VT

Rutland State Airport SRE Building Project
New Construction, Infrastructure
Results
$854,920 CJ est. value
North Clarendon, VT 05759

Slip Formed Concrete Curbing
Infrastructure
Construction
$200,000 CJ est. value
Rutland, VT 05701

Slip Formed Concrete Curbing
Infrastructure
Construction
$200,000 CJ est. value
Rutland, VT 05701

Starbucks / Rutland
Demolition, New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Rutland, VT 05701

Castleton
Infrastructure
Post-Bid
Castleton, VT 05777

New Public Safety Building - City of Rutland
New Construction, Infrastructure
Results
$5,462,000 CJ est. value
Rutland, VT 05701

Rutland Creek Path Segment 3
Infrastructure
Post-Bid
$2,500,000 CJ est. value
Rutland, VT 05701

Water Transmission Mains Storage Tank To Killington Road Contract 3B
Infrastructure
Results
$2,294,720 CJ est. value
Killington, VT 05751

Forest Road 10 Culvert Replacement Green Mountain National Forest
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Wallingford, VT 05773

Last Updated 09/28/2023 10:33 AM
Project Title

PRESS - Apartment Building - GBA Architecture

Physical Address View project details and contacts
City, State (County) Rutland, VT 05701   (Rutland County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Waterbury residents expressed concerns to the Development Review Board recently about the design of a three-story 26-unit apartment building proposed for 51 South Main Street. As part of the application for a conditional use permit, representatives from GBA Architecture in Montpelier and Downstreet Housing & Community Development updated the board at its Sept. 6 meeting on plans for the building. They said they have made design changes to address community questions about drainage and the scale and look of the complex to better fit with the character of the town’s historic district. Downstreet is a nonprofit that builds and manages affordable rental housing for mixed-income residents. The Barre-based organization owns and runs three apartment complexes in Waterbury, two in downtown and one in Waterbury Center. It has proposed the three-story building at 51 S. Main St. to include four studios, 17 single-bedroom apartments and five two-bedroom units. Architects and developers told the board that they have refined the front of the building and designed a new setback, so the structure is in line with neighboring properties. Nonetheless, several neighbors who spoke at the meeting remained skeptical. The complex would sit on what is currently a parking lot and was for years before Tropical Storm Irene in 2011 the site of the town and village offices. The building was destroyed by flooding and voters last fall approved selling the property to Downstreet to construct housing. At the recent permit review hearing, downtown resident Katya d’Angelo said that the firm’s rendering of the building looks like a “great marketing image” but doesn’t necessarily reflect how it would align with the historical character of the neighborhood. Several other audience members described the design as somewhat “modern and industrial.” Residents of Randall Street whose properties back up to 51 S. Main St. asked about details pertaining to the rear portion of the project. Lucy Ely Pagan asked about screening and landscaping and Karol Smith wanted to know about trash containers and removal of a tree that provides shade in her yard. Anne Imhoff who lives next door to the site asked about cars idling in the parking area and a project representative said “no idling” signs could be posted to discourage that. Developers have planned for 30 parking spaces, front and back porches, and a landscaping plan that adds year-round color to the property. The plan also calls for removing a few crabapples and other trees. They would keep a maple tree and art installation on the site, and add a wooden privacy fence behind the building. A board member questioned whether the landscaping would include adequate recreational space such as room where residents might be able to have barbecue grills and for children to play in addition to the area allocated to parking. Chris Balzano, a GBA architect on the project, told the board and residents at the meeting that architects have worked closely with a historical design consultant from Vanasse Hangen Brustlin, a large East Coast engineering firm with offices in South Burlington. On its website, Montpelier-based GBA Architecture touts its experience with new construction that blends into historic areas. In an interview the day after the meeting, Downstreet’s Director of Real Estate Development Nicola Anderson explained that building materials will help the complex blend in with neighboring historical buildings, including a brick facade that will match the type and height of the commercial office space next door. The developers said they will continue to take feedback from the community during the permitting review process and remain open to making design changes based on that feedback, she added. Board members asked questions regarding drainage on the site. Architects described the system of ground catch basins to collect water from the building and on the site to direct it to the existing storm drain system. There is some work still being done to determine whether an existing line to connect to the municipal water system can be used or if it will need to be moved based on the building design and the line’s location that runs under a concrete slab. GBA Architecture has applied for permits to tear out the sidewalk to create new water and sewage connections if needed. Project designers said they have not yet determined if that will be necessary. A board member asked whether Waterbury residents would have priority renting in the new complex. Anderson said Downstreet Housing would work with local agencies to prioritize town residents while following federal fair housing practices. Other details project officials noted included that renters will have access to a mailroom, a laundry area and a bike rack, as well as free, unassigned parking. The Development Review Board will continue its review of the project at its Oct. 4 meeting. Developers said they hope to begin construction next summer.

Details

3 Stories Above Grade, New Construction, New Construction. Parking Spaces, 30 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents