Similar Projects
Runway 5R-23L Rehabilitation Project, Construction Phase 4
Bidding
Greensboro, NC 27409

Harnett Regional Jetport Apron Expansion
Infrastructure
Bidding
Erwin, NC 28339

Runway 4 Approach Clearing
Post-Bid
New Bern, NC 28562

Update Markings on Taxiway F
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Parallel Taxiway Rehabilitation
Results
NC

West Ramp Expansion Phase II
Results
Charlotte, NC 28208

Hangar Taxilane, Access Road, Parking, and Utilities
Infrastructure
Bidding
Carthage, NC

North Aircraft Apron Pavement Rehabilitation
Post-Bid
Currituck, NC

Runway 18C/36C Joint Sealant Replacement, Spall Repairs and Taxiway Shoulder Repair
Results
Charlotte, NC

Air Carrier Apron Expansion Phase I
Infrastructure
Bidding
Wilmington, NC

Taxiways D and A1 Resurfacing
Post-Bid
Raleigh, NC

Runway 5R-23L Repairs
Results
Less than $598,895 est. value
Raleigh, NC 27623

T-Hangars and Taxilanes
Infrastructure
Bidding
Beaufort, NC

Airport - Partial Parallel Taxiway and Apron Expansion
Post-Bid
$3,500,000 to $3,800,000 est. value
Jefferson, NC 28640

Taxiway Shoulder Pavement Rehabilitation Phase I
Results
Charlotte, NC 28202

Last Updated 06/08/2021 09:05 AM
Project Title

FBO Apron Rehabilitation

Physical Address View project details and contacts
City, State (County) Clinton, NC 28328   (Sampson County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The overall intent of this project is to remove the existing apron asphalt, regrade the clay sand base, place 6 inches of P-209 crushed aggregate base course (CABC), and pave 4 inches of P-401 asphalt surface course. P-608 Emulsified Asphalt Seal Coat would then be applied over the apron. The project also has an alternate bid option that would use 2 inches of P-404 Fuel Resistance Asphalt Mix over 2 inches of P-401. The project also consists of Aircraft Tie Down installation and pavement marking.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents