Similar Projects
Moravian Creek Emergency Repairs
Alteration
Design
$500,000 to $1,000,000 est. value
Wilkesboro, NC

Cumberland Drive Stormwater Replacements
Infrastructure
Bidding
$3,000,000 est. value
Shelby, NC 28150

Corrugated Polypropylene Pipe
Infrastructure
Bidding
Halifax, NC 27839

Nix Road and Sunset Drive Roadway and Slope Repairs
Post-Bid
Marshall, NC 28753

Reinforced Concrete Pipe
Infrastructure
Post-Bid
Elizabethtown, NC 28337

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

Stream Debris Removal: Stretches within the Lower Little River, Anderson Creek,and Upper Little River
Term Contract
Results
$1,638,347 est. value
Lillington, NC

Erosion Control - Grading Project
Infrastructure
Post-Bid
Cameron, NC 28326

Trenchless Installation of 60 Inch Welded Steel Drainage Pipe by Bore and Jack
Results
NC

Corrugated Aluminized Pipe
Infrastructure
Post-Bid
Hayesville, NC 28904

Headwall
Results
NC 28393

Corrugated Aluminum Pipe
Infrastructure
Post-Bid
Elizabethtown, NC

Headwall
Results
Clinton, NC 28328

Catawba River Bank Stabilization
Infrastructure
Post-Bid
$246,000 est. value
Marion, NC 28752

Trenchless Installation of Welded Steel Drainage Pipe (Bore and Jack) in Division 11, Upon Request
Results

Last Updated 05/19/2022 12:08 PM
Project Title

Leith Creek Flood Damage Reduction Project

Physical Address View project details and contacts
City, State (County) Laurinburg, NC   (Scotland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of cutting and removal approximately 52 large trees from the channel and banks (leaning and falling); replacing three small, damaged storm drain culverts; excavating and placement of rip rap for outlet protection at seven (7) storm drain pipe outlets; clearing sediment and debris from within channel (~400 CY of Sediment); grading and placement of rip rap for bank stabilization (approx. 100 feet of bank).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents