Similar Projects
Last Updated | 05/19/2022 12:08 PM |
Project Title | Leith Creek Flood Damage Reduction Project |
Physical Address | View project details and contacts |
City, State (County) | Laurinburg, NC (Scotland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,000 to $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of cutting and removal approximately 52 large trees from the channel and banks (leaning and falling); replacing three small, damaged storm drain culverts; excavating and placement of rip rap for outlet protection at seven (7) storm drain pipe outlets; clearing sediment and debris from within channel (~400 CY of Sediment); grading and placement of rip rap for bank stabilization (approx. 100 feet of bank). |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |