Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

U-Haul Self-Storage Facility / Daphne
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Daphne, AL 36526

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Daphne Animal Shelter
New Construction, Infrastructure - 9,332 SF
Bidding
$4,000,000 CJ est. value
Daphne, AL 36526

Effluent Outfall Upgrades USDA Rural Development
Post-Bid
Loxley, AL 36551

Canal Road Widening Water Main Relocation (SR-161 to Wilson Boulevard)
Infrastructure
Post-Bid
Orange Beach, AL 36561

Construction of Raw Water Main for Diamante Well
Infrastructure
Results
$277,790 est. value
Daphne, AL

Canal Road Widening Water Main Relocation (Phase 2)
Infrastructure
Results
Orange Beach, AL 36561

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

Wawa / Fairhope
New Construction, Infrastructure
Conception
$1,200,000 CJ est. value
Fairhope, AL 36532

The Noble at Daphne
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Daphne, AL 36526

Last Updated 02/10/2023 03:04 PM
Project Title

GOMESA-Windscape L.S. Force Main Extension (REBID)

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

which includes horizontal directional drilling and open cut of approximately 2,600 linear feet of 12" or 16" HDPE force main and all associated appurtenances. Copies of the plans and specifications for bidding purposes may be obtained from Volkert, Inc. upon payment of $30.00 for each set to Volkert, Inc., to cover the cost of printing, reproduction, handling and distribution and will not be refunded. No plans and specifications will be issued to contractors later than twenty-four (24) hours prior to the time indicated above for receiving bids. Location: The project site is along North Main Street in Daphne, Alabama, extending from just north of Lincoln Street to approximately 600' south of D'Olive Creek, then onto the Water Reclamation Facility (WRF) site

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents