Similar Projects
Oak Street Sewer and Waste Water Treatment Plant (WWTP) Improvements
Infrastructure
Bidding
$200,000 est. value
Keo, AR 72046

Sub-Basin S004 Sewer Main Realignment, Rogers Avenue - Waldron to 56th Street
Infrastructure
Bidding
$553,000 est. value
Fort Smith, AR 72903

Upper Riverside Interceptor Assessment, Phase II
Post-Bid
$40,017 est. value
North Little Rock, AR 72117

Sewer Collection Rehabilitation
Post-Bid
Fairfield Bay, AR

Rose City and Military Drive Basins CIPP 2021 Rehabilitation Project
Results
$1,637,100 est. value
North Little Rock, AR 72117

HSWS Outfall Improvements
Results
$4,000,000 est. value
Heber Springs, AR

Wastewater Collection System Improvements
Renovation, Infrastructure
Bidding
$3,200,000 est. value
Batesville, AR

Little Osage Creek Gravity Sewer Improvements Project
Infrastructure
Post-Bid
Bentonville, AR

Sewer Line Project Rehabilitation
Results
England, AR

Wastewater Collection System Expansion Project
New Construction, Infrastructure
Bidding
$400,000 est. value
Hermitage, AR

Cured in Place Pipe (CIPP)
Infrastructure
Post-Bid
Pine Bluff, AR

PLWC Basins 1-3-4 Manhole Rehabilitation
Results
Less than $603,200 est. value
Paragould, AR

Arkansas Boulevard and Pinson Drive 12” Sewer Main Relocation
Infrastructure
Post-Bid
Texarkana, AR

Deans Trail Phase 2
Results
$2,300,000 to $2,400,000 est. value
Springdale, AR

Video Inspections
Infrastructure
Post-Bid
AR

Last Updated 05/18/2022 04:51 AM
Project Title

Construction Razorback Road Improvements

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72701   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, the widening of Razorback Road from approximately 200 feet north of the Leroy Pond/Razorback Road intersection to the Hotz Drive intersection; installation of lights and trees along the west side of the road in this vicinity; as well as the installation of new sanitary sewer main. The Contract consists of approximately 1,300 L.F. of roadway widening construction, 1,300 L.F. of sanitary sewer main replacement, 31 trees and 11 light poles and bases along with associated earthwork, storm drain, curb and gutter, sidewalk, driveways, irrigation, wiring, and other miscellaneous items

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents