Similar Projects
Parking Improvements at the Quincy Maintenance Yard / Sign Shop Parking Lot
Bidding
IL

Payson Avenue Roadway, Water Main, and Sewer Improvements
Bidding
Quincy, IL 62328

Central Division – Asphalt Paving Maintenance
Post-Bid

Bill Klingner Trail Lot 16 - Parking Lot
Post-Bid
Quincy, IL 62305

2020 MFT Maintenance - Asphalt Resurfacing
Results
Less than $1,209,945 est. value
Quincy, IL 62301

Road Patching
Results
IL

Willow Creek & Homestead Subdivisions Pavement Patching - Roadway, Water Main & Sewer Improvements
Bidding
Quincy, IL

Tar & Chip, Asphalt Milling & Resurfacing
Post-Bid
Quincy, IL 62301

Phase 1 LTCP Maximization
Renovation, Demolition
Results
Quincy, IL 62301

Removal and Installation of CSPPA
Bidding
IL

2020 Sewer Rehab/Grouting
Renovation
Results
Less than $130,312 est. value
Quincy, IL 62301

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Bidding

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Harrison to Van Buren Roadway, Water Main, and Sewer Improvements
Bidding
Quincy, IL 62301

2019 Bond Projects - Phase 2
Renovation
Results
Less than $8,311,066 est. value
Quincy, IL

Last Updated 03/26/2021 04:46 PM
Project Title

Roadway, Sidewalk and Sewer Improvements

Physical Address View project details and contacts
City, State (County) Quincy, IL 62328   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,110,965
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of 1703 square yards of PCC driveway pavement, 2652 tons of hot-mix-asphalt 4,918 feet of PCC curb & gutter, 24,781 sq ft of PCC sidewalk, storm/sanitary sewer, 31 manholes and inlets, and related improvements. Total length of the project is 1.15 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents