Similar Projects
Turkey Hill Elementary School Air Conditioning
Bidding
$25,000 est. value
Lunenburg, MA 01462

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Town Hall HVAC - AC Condenser and Coil Replacements
Post-Bid
Less than $78,000 est. value
Westminster, MA 01473

Automated Heating Control Board
Results
Athol, MA

HVAC Annual Maintenance and Boiler Cleaning and Repair Services
Term Contract
Results
Leominster, MA 01453

Emergency Heating Repair
Post-Bid
Leicester, MA 01524

HVAC Annual Maintenance 2020-2022 (School Department)
Term Contract
Results
Leominster, MA 01453

Cooling Towers 1-3 Reburbishment Project
Post-Bid
Less than $2,500,000 est. value
Worcester, MA

Worcester Challenge and Reach Academy Window/Door/Roof and Boiler Replacement - Sub-Bids
Results
Less than $4,800,000 est. value
Worcester, MA 01609

Bagg Hall Restoration - Filed Sub-Bid
Post-Bid
$1,050,000 est. value
Princeton, MA 01541

On-Call Tradesperson Contracts for HVAC, Plumbing, Electrical, and General Carpentry
Term Contract
Results
Less than $20,000 est. value
Gardner, MA

HVAC Improvements Worcester Regional Airport (ORH) - General Bids
Post-Bid
Less than $1,650,000 est. value
Worcester, MA 01602

Partial Roof Replacement at Blackstone Valley Regional Vocational Technical High School - Sub-Bids
Results
Less than $1,129,000 est. value
Upton, MA 01568

HVAC Improvements Worcester Regional Airport (ORH) - Filed Sub-Bids
Post-Bid
Less than $1,650,000 est. value
Worcester, MA 01602

2019 Roof and Boiler Replacements - Filed Sub Bids
Results
$6,504,663 est. value
Worcester, MA 01604

Last Updated 03/03/2020 09:05 AM
Project Title

HVAC Equipment Installation at Emergency Management Agency

Physical Address View project details and contacts
City, State (County) Leominster, MA 01453   (Worcester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Supplying and installing two (2) Mitsubishi Mini- Split systems at the Leominster Emergency Management Agency building. The equipment will be used to cool the Building's computer equipment room. The Contractor is responsible for all labor, equipment, and materials needed to install the Mini-Split systems. The Contractor is responsible for supplying all equipment, properly installing all equipment and making all connections, including all electrical power connections, required to make all equipment fully operational, including making all necessary wall penetrations (both interior & exterior). Contractor must have on staff, or obtain the services of, a Massachusetts licensed electrician to perform all electrical connections/hookups.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents