Similar Projects
PVC Pipe
Term Contract
Post-Bid
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Turtle Rock-McIntosh Reclaimed Water Main
Results
$503,593 est. value
Sarasota, FL 34230

Myakkahatchee Creek Water Treatment Plant to Ortiz Water Main
Results
North Port, FL

South Biscayne Drive and Pan American Boulevard Bridge Pipeline Replacements
Results
$538,357 est. value
North Port, FL 34287

Peace River Water Main Interconnect
Results
$17,786,340 est. value
Sarasota, FL 34230

San Mateo Potable Water Main
Results
North Port, FL 34286

Water Distribution System Improvements
Results
Less than $509,389 est. value
North Port, FL

West Venice Avenue Water Main Improvements
Results
$600,000 est. value
Venice, FL 34285

Nokomis Sewer Phase II
Results
FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

East Gate Utilities Relocation Phase 2
Results
$4,250,000 est. value
Venice, FL

Fire Line Backflow Services
Term Contract
Results
FL

Fairways of Capri Isles Water Main Improvements
Results
$600,000 est. value
Venice, FL

Supply and Installation of Hydra-Stop Valve Services
Results
North Port, FL

Last Updated 01/03/2022 09:29 AM
Project Title

Small Water Meter Replacement Program

Physical Address View project details and contacts
City, State (County) FL   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Purpose of selecting a vendor to provide professional installation services for replacing Automated Meter Readers (AMR) with County supplied Automated Metering Infrastructure (AMI) equipped cellular water meters and associated parts as directed by County. Approximately 30,000 meter registers and 70,000 5/8” X ¾” meter registers and bodies will need to be replaced. Three year contract with two annual renewals.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents