Similar Projects
Titan Well Natural Gas Access Pad
Infrastructure
Conception
Murrysville, PA 15632

Z2da--693-20-109 Replace Underground Storage Tanks
Design
$1,000,000 to $5,000,000 est. value
Wilkes-Barre, PA 18702

Glendale On-Road Diesel Fuel and 87 Octane Gasoline
Post-Bid
Flinton, PA 16640

2000 Gal Gasoline 5000 Gal Diesel Fuel
Post-Bid
Mount Morris, PA 15349

Fuel Tank Farm 951 Permanent Closure Services, Naval Surface Warfare Center Philadelphia Division (NSWCPD), Philadelphia Navy Business Center (PNBC), Philadelphia, PA.
Results
Philadelphia, PA 19112

Fuel Tank Replacement Project
Results
$80,000 est. value
Kutztown, PA 19530

Hose New Flyer 572938 Surge Tank, 9MM
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Construction of Second Leachate Tank
New Construction
Results
New Philadelphia, PA 17959

Fuel Tank Sump Replacements
Post-Bid
Pittsburgh, PA 15219

Paving, and Excavating and Backfilling Services
Results
$65,000,000 est. value
Philadelphia, PA 19122

Water Treatment Chemicals for 2021
Post-Bid
Jersey Shore, PA 17740

Chambersburg Natural Gas Pipeline Extension Phase 2 - Southwest Area Gas Main Extension
Results
Less than $438,106 est. value
Chambersburg, PA

S222--Line Pumping and Grease Tank Cleaning
Post-Bid
Philadelphia, PA 19104

School Bus Propane Fueling Station and Propane Autogas
Results
Fallsington, PA 19058

H391--Fuel Maintenance And Polishing At Wilkes-Barre And Philadelphia Va Medical Centers
Post-Bid
Philadelphia, Pittsburgh, PA 19104

Reported 12/03/2021 12:00 AM
Project Title

Acid Mine Drainage Abatement Project - Rausch Creek Treatment Plant Lime Tank Replacement

Physical Address View project details and contacts
City, State (County) Hegins, PA   (Schuylkill County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000 to $500,000
Plans Available from State Agency - 11/05/21
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work and approximate quantities are Temporary Lime Supply - 1 L.S. Removal of Existing Lime Storage Tank - 1 L.S. Installation of New Lime Storage Tank -1 L.S. Anchoring System - L.S.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents