Similar Projects
Replace 4th Floor Flooring
Term Contract
Design
$25,000 to $100,000 est. value
Grand Junction, CO 81501

Replace and Install Specified Tile, Repair and Replace Grout Lines
Renovation
Design
$100,000 CJ est. value
Montrose, CO 81401

The Waterloo Paired Homes at Granby Station - Phase II
New Construction - 7,408 SF
Sub-Bidding
$2,000,000 CJ est. value
Granby, CO 80446

Rifle Middle School Flooring Replacement
Alteration
Post-Bid
Rifle, CO 81650

Flooring Replacement
Alteration
Post-Bid
New Castle, CO 81647

Justice Center 1st Floor Tile Replacement
Results
Boulder, CO 80302

Pinon Hall Fire Restoration Flooring
Results
Fort Collins, CO 80521

HSB - Carpet Replacement
Alteration
Post-Bid
Pueblo, CO 81001

Allison Hall Replace Carpeting
Results
Fort Collins, CO 80521

Abatement and Floor Removal
Alteration
Post-Bid
Loveland, CO

Re-Flooring for Annex 3 and Annex 1 Buildings
Results
Montezuma, CO

Purchase and Installation of Vinyl Flooring
Alteration
Post-Bid
Durango, CO 81303

Golden Troop Office Garage Floor Coating
Results
$40,000 to $50,000 est. value
Denver, CO

Carpet Replacement with LVT Tile - Various South Area Fire Stations
Alteration
Post-Bid
Aurora, CO 80011

Fitzsimons Building 1st Replace Carpet in East Wing
Results
$115,426 est. value
Aurora, CO 80045

Last Updated 09/27/2022 05:34 PM
Project Title

Columbine High School Gym Floor Refinish

Physical Address View project details and contacts
City, State (County) Littleton, CO 80123   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The District is seeking a Contractor to sand and re-finish the gym floor at the listed school. Sample drawings are included as attachment C, however Contractor is responsible for finalize designed with school as outlined in scope of work. The Contractor is responsible for recording current painted lines on the gymnasium floors. Once floors are refinished, lines shall be painted to match existing conditions, except as otherwise indicated. General Requirements - Bid Deposit Required - Insurance Required - License Required - Local Service Required - Warranty Information Required Bonding Requirements - Bid Bond 10 % - Performance Bond 10 % - Labor and Materials Bond 10 % Delivery Point 6201 South Pierce Street Littleton, Colorado United States 80123 Purchase Type One Time Only- Delivery Date:May 30, 2023 Question Acceptance Deadline 09/12/2022 04:00 PM EDT Questions are submitted online No

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents