Similar Projects
Fish Passage - Replace Culverts with Bridges
Infrastructure
Design
$4,878,000 CJ est. value
Yreka, CA 96097

Rehabilitate Pavement
Infrastructure
Design
$33,790,000 CJ est. value
Tulelake, CA 96134

Discovery Marsh Trail
Infrastructure
Bidding
$2,000,000 CJ est. value
Tulelake, CA 96134

Newell Sewer Collection and Lagoon Improvements
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Newell, CA 96134

Newell Sewer Collection and Lagoon Improvements
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Newell, CA 96134

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Weed E.S. New Admin / Classroom Building Increment 2 Bid Package WES 2022.2.31.b Earthwork / Concrete
Renovation, Infrastructure
Results
$1,850,000 CJ est. value
Weed, CA 96094

Pavement Rehabilitation
Infrastructure
Design
$22,645,000 CJ est. value
Weed, CA 96094

RFQ Contractor - Forest Service - Klamath National Forest Vault, Vault Liner and Site Preparation and Installation
Infrastructure
Post-Bid
$500,000 CJ est. value
Yreka, CA 96097

Asphalt Rubber Chip Seal and Replace AC Surfacing
Infrastructure
Results
$1,449,105 CJ est. value
Fort Jones, CA 96032

Pavement Preservation
Infrastructure
Design
$14,060,000 CJ est. value
Weed, CA 96094

Dollar Tree - Store #08645 (Rebid)
New Construction, Infrastructure - 10,080 SF
Post-Bid
$1,200,000 CJ est. value
Weed, CA 96094

Place Hot Mix Asphalt (Type A) and Replace Asphalt Concrete Surfacing
Infrastructure
Results
$2,292,695 CJ est. value
Callahan, CA 96014

CHP Mount Shasta Area office - Parking Lot Repairs Services
Infrastructure
Post-Bid
$200,000 CJ est. value
Mount Shasta, CA 96067

Weed Elementary School Construction of 1 Kitchen /Cafeteria Building Increment 1 Underground Utilities
Infrastructure
Post-Bid
$80,000 CJ est. value
Weed, CA 96094

Last Updated 03/06/2023 05:10 PM
Project Title

Wastewater Collection System Improvements Project

Physical Address View project details and contacts
City, State (County) Yreka, CA 96097   (Siskiyou County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $6,104,627 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Engineer's Project No.: 69.60 The Project consists of installing approximately 1,710 LF of 18-inch, 380 LF of 12-inch, 6,000 LF of 8-inch, 4,000 LF of 6-inch, and 5,100 LF of 4-inch sewer piping; 34 new manholes; 17 new rod holes; 215 two-way cleanouts; 22 backcheck valves; 25 rerouted laterals, 10 replumb laterals; 190 LF of 8-inch, 760 LF of 6-inch, and 125 LF of 1-inch water piping; 2 fire hydrant; 1 CAV; +-105,000 sq. ft. of chip seal restoration; appurtenances; and abandonments per the Drawings. Engineers Construction Cost Estimate is $6,200,000 to $6,500,000.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents