Similar Projects
The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

Monongahela Riverfront for Recreational Use - Master Plan
New Construction
Conception
Pittsburgh, PA 15207

Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Lot 10 - North Shore Entertainment Building and Plaza
New Construction
Design
$4,500,000 est. value
Pittsburgh, PA 15212

Hemlock 2 Ballfield Outfield Reconstruction
Renovation
Bidding
Green Tree, PA

Trail Maintenance II
Renovation, Term Contract
Bidding
Pittsburgh, PA 15219

South Park Trail Improvement Project
Post-Bid
South Park Township, PA 15129

Great Allegheny Passage - Waterfront Paving
Renovation
Post-Bid
Homestead, PA 15120

Construction of the Bellevue Memorial Park
Results
$225,000 to $275,000 est. value
Bellevue, PA 15229

North Park Pool Bleacher Repair
Results
Allison Park, PA 15101

Hazelwood Green Plaza
New Construction - 86,196 SF
Construction
$4,975,000 est. value
Pittsburgh, PA 15207

3 Crossings Phase 2 - Building G Hopper Place Office and Park
New Construction - 150,000 SF
Construction
$12,575,000 est. value
Pittsburgh, PA 15222

Kaufmann's Grand on Fifth - Rooftop Ice Skating Rink
New Construction
Conception
Pittsburgh, PA

Frick Park - Phase 2
Renovation
Design
Pittsburgh, PA 15217

Wexford Run - Neely School Trail
Bidding
Wexford, PA 15090

Reported 05/14/2021 12:00 AM
Project Title

Prospect Park Phase I

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15207   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

his project involves the construction of a new prefabricated pavilion, including but not limited to, bulk excavation, subgrade preparation and fine grading; the purchase, assembly and installation of a prefabricated pavilion including installation of concrete piers for building column placement; the placement of site signage, asphalt paving, concrete wheel stops, retractable and permanent bollards; line striping; site preparation and removals; site restoration and associated site incidentals; complete in place. Add Alternate No. 1 This project involves the installation of concrete paving in lieu of asphalt paving, complete in place. Add Alternate No. 2 This project involves the construction of storm sewer, including but not limited to, the installation of a yard drain and storm sewer, complete in place. Add Alternate No. 3 This project involves electrical work for the prefabricated pavilion, including but not limited to, purchase and installation of new panels, wire, conduits, receptacles, and fans, complete in place.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents