Similar Projects
Avonlea Pointe Apartments
New Construction - 361,456 SF
Construction
Duluth, GA 30096

Aloft Hotel - Sugarloaf Mills
New Construction - 59,953 SF
Construction
$4,850,000 est. value
Duluth, GA 30043

Westin Infinite Energy Center Hotel
New Construction - 287,000 SF
Construction
$75,815,622 est. value
Duluth, GA 30097

Temple Tract Development
Results
Sugar Hill, GA

Gwinnett Chrysler Jeep Parking Garage
New Construction - 68,790 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Stone Mountain, GA 30087

Avid Hotel
New Construction - 42,891 SF
Sub-Bidding
$12,000,000 est. value
Duluth, GA 30097

Homewood Suites
New Construction - 74,700 SF
Construction
$11,569,100 est. value
Buford, GA 30519

Woodward Crossing
New Construction - 96,799 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Buford, GA 30519

WoodSpring Suites
New Construction - 48,660 SF
Post-Bid
$9,000,000 est. value
Duluth, GA 30097

Grove Phase 1
New Construction - 78,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Snellville, GA 30078

Broadstone Peachtree Corners
New Construction, Renovation - 277,200 SF
Conception
$10,000,000 CJ est. value
Peachtree Corners, GA 30092

E Center Event and Conference Space Project - CMAR
New Construction
Results
$500,000 to $1,500,000 est. value
Sugar Hill, GA 30518

Resurfacing City Hall Parking Deck
Renovation - 14,300 SF
Results
Sugar Hill, GA 30518

Peachtree Corners Lofts
New Construction - 194,000 SF
Conception
$10,000,000 CJ est. value
Norcross, GA 30092

Avid Hotel
New Construction - 42,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Snellville, GA 30078

Last Updated 01/21/2022 01:17 PM
Project Title

The Lawrence - Tapestry Collection by Hilton

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30046   (Gwinnett County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Parking Garage
Contracting Method
Project Status Construction Commenced January 2020, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hotel/Motel, 6 Stories Above Grade, 87,495 SF New Construction, 1.71 Acres, Parking Garage, 3 Stories Above Grade, New Construction, 380 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents