Similar Projects
Bonita Road at Acacia Avenue Drainage - San Diego County
Infrastructure
Conception
Less than $5,925,000 est. value
Bonita, CA 91902

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Metropolitan Biosolids Center (MBC) Storm Water Diversion Project
Infrastructure
Bidding
$6,900,000 est. value
San Diego, CA

MLK Recreation Center Moisture Intrusion
Infrastructure, Alteration
Bidding
$916,000 est. value
San Diego, CA 92114

Sewer & AC Water Group 793
Term Contract
Post-Bid
$6,670,000 est. value
San Diego, CA

Butler Street Stormdrain Lining
Alteration
Post-Bid
Oceanside, CA

Sewer Main Relining
Alteration
Results
$125,000 est. value
Fallbrook, CA

SDIA - Airport Administration Building - Underground Utilities
Infrastructure
Results
San Diego, CA 92108

Mira Mesa South Storm Drain Replacement
Infrastructure
Bidding
$5,930,000 est. value
San Diego, CA

Sewer and Storm Drain Maintenance Services and Video Inspections
Term Contract
Post-Bid
Solana Beach, CA

Adams Ave (1620) Storm Drain Replacement
Infrastructure
Results
$550,000 est. value
San Diego, CA

Highland and Monroe Avenue Storm Drain Replacement
Infrastructure
Bidding
$2,010,000 est. value
San Diego, CA 92115

Annual Citywide Storm Drain Facility Inspection and Cleaning Program
Term Contract
Post-Bid
Oceanside, CA

Terrasanta Improv 1 Sewer
Infrastructure
Results
$2,690,000 est. value
San Diego, CA 92101

Removal and Transport of Grit, Scum/Sludge, and Storm Water
Infrastructure
Post-Bid
San Diego, CA

Reported 07/14/2022 09:05 AM
Project Title

La Costa Stormwater Basin Rehabilitation - 20 - XX22X - City of Encinitas

Physical Address View project details and contacts
City, State (County) Encinitas, CA 92009   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

La Costa Stormwater Basin Rehabilitation As of July 13, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents