Similar Projects
Last Updated | 02/12/2022 09:32 AM |
Project Title | Resurfacing (Microsurfacing) on S.R. 84 |
Physical Address | View project details and contacts |
City, State (County) | (Overton, Putnam Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The resurfacing (microsurfacing) on S.R. 84 from the Putnam County line (L.M. 0.00) to S.R. 85 (L.M. 14.73), including bridge expansion joint repair. Project Length - 14.730 miles, The resurfacing (microsurfacing) on S.R. 84 from near Poplar Street (L.M. 9.77) to the Overton County line (L.M. 13.37). Project Length - 3.600 miles 208-01.05 Brooming & Degrassing Shoulders 36.700 l.m. 403-01.01 Bituminous Material For Tack Coat (Microsurfacing) 43.000 Ton 403-01.10 High Performance Fog Seals 27,573.000 s.y. 411-12.02 Scoring Shoulders (Non-Continuous) (16in Width) 3.800 l.m. 411-12.03 Scoring For Rumble Stripe (Noncontinuous) (8in Width) 25.400 l.m. 414-03.01 Emulsified Asphalt For Micro-Surfacing 608.000 Ton 414-03.02 Aggregate For Micro Surfacing 5,059.000 Ton 705-04.22 Guardrail Delineation Enhancement (Bidirectional) 4,120.000 Each 712-01 Traffic Control (1) Ls 712-06 Signs (Construction) 1,549.000 s.f. 713-16.01 Changeable Message Sign Unit 2.000 Each 716-01.21 Snowplowable Raised Pavement Markers (Bi-Dir) (1 Color) 1,474.000 Each 716-01.23 Snowplowable Raised Pavement Markers (Bi-Dir)(2 Color) 64.000 Each 716-01.30 Removal Of Snowplowable Reflective Marker 1,538.000 Each 716-02.04 Plastic Pavement Marking(Channelization Striping) 401.000 s.y. 716-02.05 Plastic Pavement Marking (Stop Line) 856.000 l.f. 716-02.06 Plastic Pavement Marking (Turn Lane Arrow) 40.000 Each 716-02.07 Plastic Pavement Marking (24" Barrier Line) 84.000 l.f. 716-02.09 Plastic Pavement Marking (Longitudinal Cross-Walk) 187.000 l.f. 716-04.14 Plastic Pavement Marking (Lane Reduction Arrow) 2.000 Each 716-05.05 Painted Pavement Marking (Stop Line) 55.000 l.f. 716-05.20 Painted Pavement Marking (6" Line) 98.500 l.m. 716-08.20 Removal Of Pavement Marking (Line) 78.800 l.m. 716-12.02 Enhanced Flatline Thermo Pvmt Mrkng (6in Line) 62.100 l.m. 716-12.05 Enhanced Flatline Thermo Pvmt Mrkng (6in Dotted Line) 350.000 l.f. 716-12.06 Enhanced Flat Line Thermo (8in Line) 1,750.000 l.f. 717-01 Mobilization (1) Ls 604-10.44 Expansion Joint Repairs 112.000 l.f. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |