Similar Projects
RFQ Design - Truckee Meadows Water Reclamation Facility (TMWRF) Disinfection and Filtration Process Expansion Evaluation and Pre-Design Services
Addition, Demolition, Infrastructure
Conception
$5,000,000 CJ est. value
Reno, NV 89501

5th, 6th, 7th, and G Street Main Replacement
Infrastructure
Bidding
$902,000 CJ est. value
Reno, NV 89501

RFP - Development of Research Park Site(s) for Research Facilities
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Reno, NV 89557

Football Scoreboard at Spanish Springs High School
Infrastructure
Sub-Bidding
$155,000 CJ est. value
Sparks, NV 89441

Development of Airport Site for Air Cargo Facilities
Infrastructure
Post-Bid
Reno, NV 89502

USFS Region 1/Region 4 Hand Thinning
Term Contract
Post-Bid

Deep And Shallow Sonic Monitoring Wells - Truckee Meadows Water Authority
Results
Reno, NV 89502

South Carson Street Landscape Maintenance
Results
Less than $95,000 est. value

Quick Quack Car Wash / Reno
New Construction, Infrastructure - 3,597 SF
Pending Verification
$800,000 CJ est. value
Reno, NV 89506

North Sierra Street Mixed Use
Infrastructure, Renovation
Pending Verification
$6,500,000 CJ est. value
Reno, NV 89501

Sewer Lateral Replacement at Sparks High School
Infrastructure
Bidding
$85,000 CJ est. value
Sparks, NV 89431

USFS Region One Timber Stand Improvement and Hand Fuels Treatments
Alteration
Post-Bid

Jay Dow and Main Station Field Lab Pivot and Linear Irrigation Systems
Term Contract
Results
Reno, NV 89502

Landscape Right of Way Maintenance
Alteration
Bidding
Reno, NV

Landscaping
Term Contract
Post-Bid
Reno, NV

Last Updated 08/02/2022 07:03 PM
Project Title

Replacement of Site Irrigation at George L Dilworth Middle School

Physical Address View project details and contacts
City, State (County) Sparks, NV 89431   (Washoe County)
Category(s) Education, Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $151,550 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Clear minor vegetation, place DG mulch in landscaping areas, upgrade the rear irrigation backflow assembly, install new irrigation controller with minor electrical repairs, replace remote control sprinkler valves, perform miscellaneous irrigation repairs and upgrades throughout the campus. Question Deadline: Thu 07/21/2022 05:00 PM* 21094.00W, WA-2022-401

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents