Similar Projects
Reunion Ridge Filing No. 1 District Improvements
Post-Bid
Less than $13,000,000 est. value
Centennial, CO

Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Rehabilitating Curb Ramps on SH83, SH86, SH85 and I-25
Results
$1,000,000 to $5,000,000 est. value

Orchard Road Trail
Results
$350,000 to $400,000 est. value
Centennial, CO 80112

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

Greenwood Gulch Undercrossing Improvements
Post-Bid
Greenwood Village, CO

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

Greenwood Gulch Undercrossing
Post-Bid
Centennial, CO 80111

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

2020 Concrete Catch-Up Program
Results
Less than $420,891 est. value
Centennial, CO

2019 CDBG Shepperd Avenue Project
Results
Less than $323,333 est. value
Littleton, CO 80120

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Lone Creek Regional Trail Phase 1A
Results
Less than $1,004,305 est. value
Centennial, CO 80112

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Last Updated 04/10/2020 07:22 AM
Project Title

Ramp Safety Improvements at the Southbound I-225 at Parker Road

Physical Address View project details and contacts
City, State (County) CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ramp Safety Improvements at the southbound I-225 at Parker Rd (SH 83) off ramp and at southbound I-225 on the I-25 northbound onramp. Work includes concrete and asphalt roadway widening work, barrier and slope paving removal and replacement, guard rail placement, and removing and installing signs and sign structures. 201-00000 Clearing and Grubbing 1.000 L S 202-00026 Removal of Slope and Ditch Paving 2,141.000 SY 202-00027 Removal of Riprap 26.000 SY 202-00210 Removal of Concrete Pavement 1,184.000 SY 202-00220 Removal of Asphalt Mat 669.000 SY 202-00250 Removal of Pavement Marking 5,550.000 SF 202-01130 Removal of Guardrail Type 3 1,152.000 LF 202-01170 Removal of Guardrail Type 7 1,068.000 LF 202-04010 Clean Inlet 14.000 EACH 203-00010 Unclassified Excavation (Complete In Place) 6,310.000 CY 203-01597 Potholing 60.000 HOUR 206-00100 Structure Backfill (Class 1) 301.000 CY 207-00205 Topsoil 915.000 CY 208-00002 Erosion Log Type 1 (12 Inch) 3,903.000 LF 212-00006 Seeding (Native) 1.700 ACRE 214-00000 Landscape Maintenance 1.000 L S 304-06000 Aggregate Base Course (Class 6) 1,947.000 TON 403-34871 Hot Mix Asphalt (Grading SX) (100) (PG 76-28) 185.000 TON 412-01250 Concrete Pavement (12-1/2 Inch) 5,987.000 SY 506-00030 Grouted Riprap 11.000 CY 507-00000 Concrete Slope and Ditch Paving 178.000 CY 602-00000 Reinforcing Steel 12,500.000 LB 606-00302 Guardrail Type 3 (31 Inch Midwest Guardrail System) 1,935.000 LF 606-00920 Guardrail Type 9 (Style CC) 1,128.000 LF 614-00013 Sign Panel (Class III) 1,025.000 SF 614-42400 Monotube Overhead Sign Bridge (24 Inch Diameter) 1.000 EACH 620-00002 Field Office (Class 2) 1.000 EACH 620-00012 Field Laboratory (Class 2) 1.000 EACH 625-00000 Construction Surveying 1.000 L S 626-00000 Mobilization 1.000 L S 626-01113 Public Information Management (Tier III) 67.000 DAY 627-01010 Preformed Plastic Pavement Marking (Type I)(Inlaid) 1,240.000 SF 627-01011 Preformed Plastic Pavement Marking (Contrast)(Inlaid) 1,240.000 SF 630-00003 Uniformed Traffic Control 32.000 HOUR 630-00006 Uniformed Traffic Control (Vehicle) 32.000 HOUR 630-00007 Traffic Control Inspection 50.000 DAY 630-00012 Traffic Control Management 100.000 DAY 630-80355 Portable Message Sign Panel 4.000 EACH 630-80370 Barrier (Temporary) 5,300.000 LF 630-85041 Mobile Attenuator 25.000 DAY 632-00000 Night Work Lighting 1.000 L S

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents