Similar Projects
Install New Backflow Preventer
Infrastructure
Post-Bid
Philadelphia, PA 19104

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Juniper Street Storm Sewer and Water Main Replacement
Results
Quakertown, PA 18951

2020 Water System Improvements Project - Phase 2
Results
$2,000,000 est. value
Warminster, PA 18974

2021 Infrastructure Improvement Project Group
Results
Lansdale, PA 19446

Water Main Improvements Project - Upper and Lower Barness Roads
Results
Warrington, PA 18976

West Broad Street Water Main Replacement Project
Results
Less than $360,000 est. value
Telford, PA 18969

Water Service Installation - Contractor Services
Term Contract
Results
Warminster, PA

Butler Avenue Water Man Extension
Infrastructure
Results
$750,000 to $800,000 est. value
Doylestown, PA

North Main Street Water Main Project
Infrastructure
Results
$135,000 est. value
Doylestown, PA 18901

Stonebridge and Pennland Farms Water Systems Interconnection Project
Infrastructure
Results
Perkasie, PA 18944

Furnish and Supply New Kennedy Fire Hydrants, Valves and Pipes
Infrastructure
Results
PA

Relay of Water Mains in Battersby Street
Infrastructure
Results
$5,000,000 est. value
Philadelphia, PA 19102

Relay of Water Mains in Unruh Avenue
Alteration
Results
$4,000,000 to $5,000,000 est. value
Philadelphia, PA 19102

Sewer Reconstruction and Relay of Water Mains in N. 30th Street
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
Philadelphia, PA 19102

Last Updated 05/06/2022 02:24 AM
Project Title

2022 Water System Improvements

Physical Address View project details and contacts
City, State (County) Warminster, PA   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally includes the construction of approximately 100 linear feet of 10-inch ductile iron pipe, 900 linear feet of 8-inch ductile water main, 11,415 linear feet of 6-inch ductile iron water main, 12 fire hydrant assemblies, 242 service connections and water main appurtenances. Construction will occur in State and Township rights-of-way and will involve restoration of roadway, lawn areas and provisions for all necessary erosion and sedimentation controls.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents